Home Open Account Help 310 users online

Western Railroad Discussion > Tunnel Tuesday


Date: 11/25/14 21:33
Tunnel Tuesday
Author: jmw

Here are a couple head-end tunnel views from California mainlines:

1. Tunnel #41 - Donner Pass
2. Tunnel #26 - Santa Susana Pass
3. Golden State Freeway and Antelope Valley Freeway Interchange - Antelope Valley Line between LA & Lancaster/Palmdale.

JMW
http://waidephoto.smugmug.com/Trains



Edited 2 time(s). Last edit at 11/28/14 23:24 by jmw.








Date: 11/25/14 21:42
Re: Tunnel Tuesday
Author: railstiesballast

In the second image you can see the little drainage sumps with pumps that SCRRA installed back in October, 2000.
Tunnel 26 (near Chatsworth, CA) is in sandstone with alternating strata of hard, impervious rock and softer, water-bearing rock.
If the water is not drained away the soft rock turns into mud and the track surface gets bad.
In 2000 we removed all the track, replaced the ballast, and improved on the pumping.
As far as I know it is still good for 40 MPH.

I hope to have a post on this work at some future time.

Thanks for posting.



Date: 11/25/14 22:30
Re: Tunnel Tuesday
Author: bearease

Exceeeeedingly cool!
And two out of three are near the areas where I grew up.
Great post!



Date: 11/26/14 16:32
Re: Tunnel Tuesday
Author: ns1000

My favorite is Pic 2!!!



Date: 11/26/14 17:22
Re: Tunnel Tuesday
Author: coach

railstiesballast Wrote:
-------------------------------------------------------
> In the second image you can see the little
> drainage sumps with pumps that SCRRA installed
> back in October, 2000.
> Tunnel 26 (near Chatsworth, CA) is in sandstone
> with alternating strata of hard, impervious rock
> and softer, water-bearing rock.
> If the water is not drained away the soft rock
> turns into mud and the track surface gets bad.
> In 2000 we removed all the track, replaced the
> ballast, and improved on the pumping.
> As far as I know it is still good for 40 MPH.
>
> I hope to have a post on this work at some future
> time.
>
> Thanks for posting.

When the CP drilled their new Mt. MacDonald tunnel, they laid a full-length concrete pad for the rails. Would that be a good thing for Tunnel 26, given the drainage issues??



Date: 11/28/14 14:41
Re: Tunnel Tuesday
Author: JLY

Tunnel in first picture is about one third of the way west bond through Tunnel 41. on Donner Summit.



Date: 11/28/14 23:29
Re: Tunnel Tuesday
Author: jmw

Thanks JLY!

JMW



[ Share Thread on Facebook ] [ Search ] [ Start a New Thread ] [ Back to Thread List ] [ <Newer ] [ Older> ] 
Page created in 0.0402 seconds