CN Mayerthorpe Bridge ( New)
Author: P

ok



Edited 2 time(s). Last edit at 05/17/16 17:53 by P.



Date: 05/17/16 17:53
Re: CN Mayerthorpe Bridge ( New)
Author: P

OK, I can't get a .png file to post here in TO, but I received a photo today of the new bridge with a train on it.  It is fairly close up, but it appears that the new bridge is only perhaps 300-400 feet long.  Must have used a massive amount of fill.

Perhaps someone else can post a pic as I'm sure there have been some published.



Date: 05/17/16 17:58
Re: CN Mayerthorpe Bridge ( New)
Author: Ray_Murphy




Date: 05/19/16 07:10
Re: CN Mayerthorpe Bridge ( New)
Author: hoggerdoug

20 some days to build a bridge?? I hope the first train crew over the new structure demands somebody from Engineering to ride with them, a test of sorts.
I know a helicopter mechanic in Williams Lake, after he does repairs, the pilot does a test flight and the mechanic goes with it. Testing his ability and faith in the workmanship.
Doug



Date: 05/20/16 10:58
Re: CN Mayerthorpe Bridge ( New)
Author: notabob

According to the article, the new bridge is actually 292ft longer, but that may be including the fill, vs. the original all-trestle construction.