Home Open Account Help 537 users online

Steam & Excursion > LeapPTC on NMSL&RHS 2926?


Date: November 02, 2026 08:42AM
LeapPTC on NMSL&RHS 2926?
Author: ShoreLineRoute

While looking at the nice photos of the NMSL&RHS Pete Lerro photo run, I noticed that the diesel was positioned at the end of the train vs. behind the 2926.  I recall that this organization is working on upgrading the locomotive's PTC installation to enable running without a diesel, vs the current LeapPTC system which requires one, what is the status of that effort?  Was operating PTC not required for this photo run, which ran without passengers?

Thanks in advance!
Oliver Barrett



Edited 1 time(s). Last edit at 11/02/2026 08:43AM by ShoreLineRoute.



Date: November 02, 2026 09:03AM
Re: LeapPTC on NMSL&RHS 2926?
Author: HotWater

ShoreLineRoute Wrote:
-------------------------------------------------------
> While looking at the nice photos of the
> NMSL&RHS Pete Lerro photo
> run, I noticed that the diesel was positioned at
> the end of the train vs. behind the 2926.  I
> recall that this organization is working on
> upgrading the locomotive's PTC installation to
> enable running without a diesel, vs the current
> LeapPTC system which requires one, what is the
> status of that effort?  Was operating PTC not
> required for this photo run, which ran without
> passengers?
>
> Thanks in advance!
> Oliver Barrett

From previous posts, 2926 is already equipped with PTC. The diesel on the end of the train is placed there in order to pull the entire train set back to its starting point, since there is no wye to turn on.



Date: November 02, 2026 11:17AM
Re: LeapPTC on NMSL&RHS 2926?
Author: TractiveEffort

NMRX 2926 has some portion of the required onboard PTC equipment installed, but it is not operative.  Onboard PTC equipment is just one piece of the overall puzzle required for full PTC operation.



Edited 1 time(s). Last edit at 11/02/2026 11:20AM by TractiveEffort.



Date: November 02, 2026 02:53PM
Re: LeapPTC on NMSL&RHS 2926?
Author: Cumbresfan

Currently for test runs 2926 is limited to the NM DOT track between Los Lunas and Bernalillo, crew only and at restricted speed. My understanding is that when full PTC is operational it can run those segments at track speed. No paid passenger trips in the near future.



Date: November 02, 2026 03:37PM
Re: LeapPTC on NMSL&RHS 2926?
Author: ShoreLineRoute

Thanks to all for the interesting info!

Oliver Barrett



Date: November 02, 2026 04:55PM
Re: LeapPTC on NMSL&RHS 2926?
Author: SGillings

Is "no paid passengers" due to cost of liability insurance or other NM DOT restrictions or something else?

Steve



Date: November 02, 2026 07:23PM
Re: LeapPTC on NMSL&RHS 2926?
Author: akpsteam

SGillings Wrote:
-------------------------------------------------------
> Is "no paid passengers" due to cost of liability
> insurance or other NM DOT restrictions or
> something else?
>
> Steve

Mainly due to lack of PTC. Once the full PTC installation is finished they should be allowed to carry passengers at least travel further towards Belen, Santa Fe or Lamy.



[ Share Thread on Facebook ] [ Search ] [ Start a New Thread ] [ Back to Thread List ] [ <Newer ] [ Older> ] 