Home Open Account Help 307 users online

Railfan Gaming > Eastbound Intermodal on Stevens Pass Part 4 (Last)


Date: 12/02/08 09:28
Eastbound Intermodal on Stevens Pass Part 4 (Last)
Author: AmtrakPalmetto

Ran this Z-SSECHC9-26A over Stevens Pass, and decided to take some "photos" along the route. Speed stayed in the 15mph range while climbing the grade. Enjoy the photos.

Details:
BNSF ES44AC #6238
CSX AC6000CW #609
CSX SD80MAC #806
BNSF ES44AC #6135

100 platforms
7258 tons
8490 feet

One thing I calculated is that a train requires 1.8755497kw / US ton to make it over Stevens Pass, at a speed of about 15mph. This is for Microsoft Train Simulator purposes only.

Photo 1: Peshastin
Photo 2: 45mph running along the river
Photo 3: View of the valley, river and the whole train








Date: 12/02/08 09:29
Re: Eastbound Intermodal on Stevens Pass Part 4 (Last)
Author: AmtrakPalmetto

Photo 4: Crossing a bridge, with a vehicular bridge in the background.
Photo 5: Dryden, MP 1666.
Photo 6: Snaking its way through a valley.








Date: 12/02/08 09:31
Re: Eastbound Intermodal on Stevens Pass Part 4 (Last)
Author: AmtrakPalmetto

Photo 7: Intermodal cars winding through the valley.
Photo 8: Approaching Cashmere.
Photo 9: Rolling through Cashmere.








Date: 12/02/08 09:32
Re: Eastbound Intermodal on Stevens Pass Part 4 (Last)
Author: AmtrakPalmetto

Photo 10: Another view of Cashmere.
Photo 11: A vehicular bridge in the foreground and a railroad truss bridge in the background, slowing for 25mph into Wenatchee.
Photo 12: Wenatchee Junction, MP 1653.








Date: 12/02/08 09:34
Re: Eastbound Intermodal on Stevens Pass Part 4 (Last)
Author: AmtrakPalmetto

Photo 13: Arriving in Wenatchee.
Photo 14: Another view of Wenatchee.
Photo 15: Entering Wenatchee Apple Yard at 10mph.








Date: 12/02/08 09:35
Re: Eastbound Intermodal on Stevens Pass Part 4 (Last)
Author: AmtrakPalmetto

Photo 16: Fred's blinking at the end of the train.
Photo 17: Head end passing Wenatchee Amtrak station.
Photo 18: A crossover on a bridge.








Date: 12/02/08 09:40
Re: Eastbound Intermodal on Stevens Pass Part 4 (Last)
Author: AmtrakPalmetto

Photo 19: Almost done yarding the train.
Photo 20: Yarding of the train is complete. Three tracks were used for the train.
Photo 21: Engines resting on the ready tracks.

That is all folks, the 4 1/2 hour journey from Mulkiteo has come to an end for the crew of BNSF 6238. The train has been yarded, and the engines by the ready tracks. Soon the engines will be serviced, another crew will arrive, the train built, and another journey begins onwards to Boise, Idaho. I hope you all enjoyed this series on Microsoft Train Simulator. Stay tuned for another series coming soon.








[ Share Thread on Facebook ] [ Search ] [ Start a New Thread ] [ Back to Thread List ] [ <Newer ] [ Older> ] 
Page created in 0.0485 seconds