Home Open Account Help 524 users online

Canadian Railroads > On this day


Date: 06/18/26 11:58
On this day
Author: hoggerdoug

June 18, 2008, southbound on the Rocky Mountaineer traveling through the Shalalth tunnel on the BC Rail Squamish sub. The tunnel is approximately 3,000 feet long, mile board  141 is at the north portal and the north switch of Seton siding is a few hundred feet south from the south portal.








Date: 06/18/26 11:59
Re: On this day
Author: hoggerdoug

one more from that day.
Doug




Date: 06/18/26 12:41
Re: On this day
Author: 3rdswitch

Very cool.
JB



Date: 06/19/26 01:19
Re: On this day
Author: E25

Definitely a perspective that stays in your mind.  Thanks for your post.

Greg Stadter
Phoenix, AZ



Date: 06/19/26 08:07
Re: On this day
Author: TCnR

The proverbial light at the end of the tunnel.
t4p.



Date: 06/19/26 12:16
Re: On this day
Author: dan

what were the speedlimits for the rdc's up there?



Date: 06/20/26 04:36
Re: On this day
Author: hoggerdoug

Maximum speed limit on RDC's was 65mph, although done faster than that where possible.  All trackage had various time table permitted speeds, dpending on track curvature, location etc, varied 20 mph to 65mph. The Rocky Mountaineer was pretty much freight train speeds, although permitted faster in some locations.
Doug

dan Wrote:
-------------------------------------------------------
> what were the speedlimits for the rdc's up there?



[ Share Thread on Facebook ] [ Search ] [ Start a New Thread ] [ Back to Thread List ] [ <Newer ] [ Older> ] 
Page created in 0.0569 seconds