| Home | Open Account | Help | 357 users online |
|
Member Login
Discussion
Media SharingHostingLibrarySite Info |
Canadian Railroads > Road Trip 2026, Day 6 Part 2 - Ping-Ponging Savona and WalhachinDate: October 16, 2026 07:32PM Road Trip 2026, Day 6 Part 2 - Ping-Ponging Savona and Walhachin Author: feclark Last Friday I posted the morning of the sixth day of our road trip at https://www.trainorders.com/discussion/read.php?15,6228536. This continues Thursday, June 11, 2026 with 14 photos.
1. Having messed up a chance to get ahead of CPKC #100 at Walhachin (see previous post), we were still able to beat it to the highway overpass of west switch Savona. The siding at Savona had been plugged since at least 0800 Monday by a potash train; we'd seen power on it on our way west earlier today. They were ready to go, finally, waiting for #100 to clear. At 1210, CPKC-painted CP 7511 and 7431 killed lights for the meet with WB potash behind CP 9711 and CN 2857. The full passage of 100's well cars (plus one auto rack) took some time. A WB CN freight called Savona, so we headed back to Walhachin to shoot it, hoping the potash train would take its time as well. 2. A bit of a dirt track takes you in a short distance by the CN ROW near the road bridge. Grain train #811 was pulled by CN 2956 and 2037 (ex-GE blue leaser) and assisted by DPU CN 3852, at 1240. The 208 cars (850 total axles) were dominated by Grains Connect covered hoppers. 3. Next up was the west switch Walhachin on CPKC, where the potash monster took its time arriving. Power was of course CP 9711 and CN 2857, with DPU pusher CP 8778. This one had 199 cars, 814 total axles, and we had 25 degrees, our warmest day. It was nice to feel the sun. Date: October 16, 2026 07:40PM Re: Road Trip 2026, Day 6 Part 2 - Ping-Ponging Savona and Walhac Author: feclark 4. Once that cleared, we got jumped by CN moving by below us. By the time we re-positioned ourselves at 1321, the head-end of #106 was by us. I consoled myself with a shot of DPU pusher CN 3174.
5. Almost immediately we had chatter for EB Work #906, and were in great position for a lovely shot. We were less than pleased to see light engine CN 2307 running long-hood forward. The distant Difco helps the shot work (or at least, it doesn't suck as much). 6. We moved back up to the grade crossing of CPKC in time to shoot EB grain empties at 1341, behind CP 9365 and assisted by DPU pusher KCS 4827. All this action at Walhachin was preventing us from getting back to Savona, where we wanted to set up at the east end for WB action. It's a great location we used a couple of years earlier. Now that the siding was clear, the shot would be available. Date: October 16, 2026 07:51PM Re: Road Trip 2026, Day 6 Part 2 - Ping-Ponging Savona and Walhac Author: feclark 7. Not so fast! The grain train came to a stop, so we knew we had a WB coming. Our photographic options were hampered by the presence of a foreman and crew, so we were confined to the road. It's a bit full of poles and wires, but CPKC paint on 7560 was a nice sight, as it was on DPU CP 7492. Ahead of the DPU, ONE and Yang Ming containers were dominant; behind it, lots of Evergreen and ONE. Photo at 1359, 416 axles, 23 degrees.
8. Okay, back to Savona to set up on CPKC. Not yet. As we came down the hill to cross the water, a CN WB was making tracks toward us. We barely got in to the road at the head of CN's small 'yard' (fortunately there was no opposing traffic for our left turn, and no-one on our tail), bailed out, and grabbed this shot. CN 2758 (ex-CREX) and 3257 were moving #111 at 1418, 376 axles of all stacks and no DPU, 32 mph and 26 degrees. There is time to shoot here and beat the train to Walhachin, but you have to motor. As we were leaving, Ed spotted a WB movement on CPKC. This could get good. 9. On the way back to Walhachin (will we ever set up at Savona?), I forcefully told our driver/videographer that once the power on #111 was by us at Walhachin, we had to pull out, cross the river, and climb up to the grade crossing as quickly as possible, to bag the CPKC movement. At 1434 (16 minutes after Savona), CN 2758 and 3257 came by. Time to move. Nope. My video-shooting friend stayed rooted to the spot until the whole train had gone by. That was three minutes or so. Date: October 16, 2026 08:04PM Re: Road Trip 2026, Day 6 Part 2 - Ping-Ponging Savona and Walhac Author: feclark 10. You guessed it. We climb the hill onto the flat in time to see the headlights of CPKC, already past the grade crossing. Nuts! To rub salt in the wound, we had an SD, the only one on this trip. At 1438, CP 8885 and 5866 led #201, with tanks, DPU KCS 4065, and auto racks, totalling 506 axles and 122 cars. That was goof-up number 2. The third one was soon to follow.
11. At last we were free to return to Savona, but my companions are modellers; no offence. But they could not resist the siren call of Kelly's Caboose, a hobby shop in town. While they went inside to look at stuff, with almost no prospect of a purchase, I stayed trackside monitoring the scanner. Sure enough, a WB called for Tunkwa (you can see the west mileboard for it), and I went in to fetch my buddies. Instead of the shot they wanted, in perfect sun, we had this option, which I quite liked. This is auto rack and stack train #101, led by CPKC-painted CP 7531, and CP 8072. The 566 axles were helped along by DPU CP 8852 at 1513. This completed the trifecta of bad decisions, although I could live with this one because I nailed the perfect shot at the east end of Savona in 2024. 12. You may have noticed a certain something in the sky of the previous photo. Sure enough, we set up at the east end of town before a heavy downpour hit. We stayed in the car for one EB, no notes taken. The next EB came through as the sun created a rainbow at 1729. I never did record the lead unit numbers on this mixed consist; KCS 5012 was shoving on the rear. It had taken some talking on my part to persuade them that the sun would break through, so we were here instead of back in Kamloops. Date: October 16, 2026 08:11PM Re: Road Trip 2026, Day 6 Part 2 - Ping-Ponging Savona and Walhac Author: feclark 13. They wanted to call it a day, but I said, "No, no, no, there's still a good chance of a hole in the clouds, and what are we going to do in Kamloops?" After a lapse of close to a half-hour, the scanner told us we had a WB coming. Comparing this photo and the next one, you can see we got lucky in terms of the movement of the clouds. At 1807, another WB potash train showed up, this time rolling through Savona instead of clogging the siding. The lead power was CP 8877 and 8929, the DPU pusher was CP 8736. It pulled into sun as it rounded the point, passed through shadow, and was lit as it came by us.
It was on odd day; perhaps I was soured from the way some of the previous days had gone. But with no intention of going out to Ashcroft on this trip, we'd ended up there anyway. Then we'd messed up three really good photo opportunities with bad decisions I'd even warned about. But you know, 20 trains in sunlight is not a bad day's shooting, and it beats being at home doing chores or errands. The passage of time heals things, I guess. Thanks for looking. Fred Date: October 16, 2026 10:52PM Re: Road Trip 2026, Day 6 Part 2 - Ping-Ponging Savona and Walhac Author: refarkas First-class images - superior views!
Bob Date: October 17, 2026 07:31PM Re: Road Trip 2026, Day 6 Part 2 - Ping-Ponging Savona and Walhac Author: TCnR Good stuff, lots of action.
Had to get a map out to keep track. First time I've looked for the east end of the DRZ. t4p. Date: October 20, 2026 11:48PM Re: Road Trip 2026, Day 6 Part 2 - Ping-Ponging Savona and Walhac Author: greasemonkey Nice shots! It's kind of neat seeing my house in one of your pictures.
Brian Date: October 22, 2026 05:39PM Re: Road Trip 2026, Day 6 Part 2 - Ping-Ponging Savona and Walhac Author: ns1000 Nice pics!!
|