| Home | Open Account | Help | 426 users online |
|
Member Login
Discussion
Media SharingHostingLibrarySite Info |
Canadian Railroads > Getting Ready for WinterDate: November 03, 2026 04:49PM Getting Ready for Winter Author: cn6218 A week ago, I happened to hear on the radio that "Work 900" was about to leave Rockingham, via the transfer track, for the Bedford Sub CTC. My first thought was that there was a B&LE tunnel motor on the loose (it has happened), but this 900 was the train number, a train tasked with topping up the supply of propane at all the switch heaters along the line. Fortunately they didn't get far, since the first switch is at mile 7.9, where the transfer track joins the main line. After about 45 minutes, with that one out of the way, they were nearing mile 10 on the Bedford Sub, with the next stop at Windsor Jct., mile 15.6.
Leading the train was a bit of a rarity in these parts, GTW GP38-2 6226. It was built as DT&I 226 in 1975, and would have been painted in DT&I orange then. Sometime after GTW bought DT&I in 1984, it got the blue Grand Trunk paint, and then more recently the current CN scheme, although still with GTW reporting marks. The scruffy GP38-2W trailing is CN 4809, CN's second last unit of that model. It was delivered in 1974 as 5609, and I wouldn't be surprised if that is its original paint. In previous years the propane train consisted of just an engine, tank car and boxcar with pump and hoses. This time however, they had several flatcars and empty rail cars (to increase the axle count I suspect), with the pumping equipment tied down on the XTTX flatcar. GTD Edited 1 time(s). Last edit at 11/03/2026 04:53PM by cn6218. |