| Home | Open Account | Help | 495 users online |
|
Member Login
Discussion
Media SharingHostingLibrarySite Info |
European Railroad Discussion > Swiss Alps, Part 6b, VerticAlp to Emosson Dam, 7/28/26Date: 08/13/26 04:29 Swiss Alps, Part 6b, VerticAlp to Emosson Dam, 7/28/26 Author: GPutz From Emosson Dam
1. A Panoramic Train locomotive runs around its train at the minifunic’s lower station. 2. It’s a big lake. 3. The Vieux-Emosson Dam is above the Emosson Dam. It was immediately recognized when it was completed in 1955 that it was inadequate, so planning started for the Emosson Dam. It’s still in use That’s a restaurant on the hill in front of the dam. Gerry Date: 08/13/26 04:30 Re: Swiss Alps, Part 6b, VerticAlp to Emosson Dam, 7/28/26 Author: GPutz From Emosson Dam
4. We take the minifunic down to the Panoramic Train. From the Lower minifunic Station 5 & 6. We just miss a departure, but here it is about to meet the next train that is stopped in a siding on the other side of a tunnel. Gerry Date: 08/13/26 04:31 Re: Swiss Alps, Part 6b, VerticAlp to Emosson Dam, 7/28/26 Author: GPutz From the Lower minifunic Station
7 – 9. The next train arrives and locomotive LEB7-02 runs around. The driver never leaves the cab, so switches and couplings and un-couplings are automated. Gerry Date: 08/13/26 04:33 Re: Swiss Alps, Part 6b, VerticAlp to Emosson Dam, 7/28/26 Author: GPutz From Panoramic Train
10 & 11. We get the front seat for the meet. Les Montuires 12. These are battery-electric locomotives, and they must have a lot of battery because there is no time to recharge them between runs which start immediately after the passengers board the train. Gerry Date: 08/13/26 04:34 Re: Swiss Alps, Part 6b, VerticAlp to Emosson Dam, 7/28/26 Author: GPutz Les Montuires 13. Don’t be fooled, this has an internal combustion engine.
14 & 15. I don’t have any information on these critters. The blue one may still do MoW work. Gerry Date: 08/13/26 04:35 Re: Swiss Alps, Part 6b, VerticAlp to Emosson Dam, 7/28/26 Author: GPutz Chamonix Mont Blanc, France, 7/27/26
16. Last light on Mont Blanc Summit from the chalet’s deck It was a great seven days with family, mountains and trains. References: railsmith also made two excellent posts on Trainorders recently about the Emosson Dam and its funiculars and train: https://www.trainorders.com/discussion/read.php?17,6196079 https://www.trainorders.com/discussion/read.php?17,6196458 https://www.verticalp-emosson.ch/en/emosson/site-emosson-en https://en.wikipedia.org/wiki/%C3%89mosson_Dam https://emosson.ch/en/histoire Gerry Date: 08/13/26 07:51 Re: Swiss Alps, Part 6b, VerticAlp to Emosson Dam, 7/28/26 Author: railsmith GPutz Wrote:
------------------------------------------------------- > Les Montuires 13. Don’t be fooled, this has an > internal combustion engine. > 14 & 15. I don’t have any information on these > critters. The blue one may still do MoW work. The 0-4-0 diesel in photo 14 is British, made by Ruston & Hornsby. More info on the history of the construction railway and the modern-day tourist operation here: https://www.narrow-gauge.co.uk/articles/the_chemin_de_fer_demosson Date: 08/15/26 00:17 Re: Swiss Alps, Part 6b, VerticAlp to Emosson Dam, 7/28/26 Author: 55002 Another great series. Thanks, Chris uk.
|