Work at Rochester Pa on NS?
Author: mw2007

Seen some videos on YouTube showing NS trains at Rochester and in the videos you can see track panels being built and excavator by the switches. Is this the start of removing the switches and dropping in track panels now that CP Bright is up and running?
Thanks for any info
Any pics would be cool to see of the project if what is going on there

Posted from iPhone



Date: 02/15/17 09:33
Re: Work at Rochester Pa on NS?
Author: operatorjoe

Was at Rochester Pa this morning to check out the situation. While there were MW forces on scene, not much was happening. I did did see that they had straight railed the west end of the crossover on No 2 track(westbound main) at the extreme west end of the interlocking.

​Joe Cearfoss
​Ellwood City,Pa



Date: 02/16/17 14:59
Re: Work at Rochester Pa on NS?
Author: Out_Of_Service

is there still 2 tracks from Rochester to Beaver Falls on the Youngstown Line ... one through ... one stub ended ...