Eastern Railroad Discussion > Current Norfolk Southern Daily Scheduled Train Counts


Date: 10/17/20 06:47
Current Norfolk Southern Daily Scheduled Train Counts
Author: NSSpike

The chart below shows the current number of scheduled manifest, automotive and intermodal trains for the NS. Over the past 30+ months there has been a reduction of 116 scheduled trains on the system. These number DO NOT include unit grain / coal / ethanol trains that continue to operate as needed on the system. Most, not all of the current 253 trains operate daily with a few either operating 5 or 6 days a week. Also a couple of trains like 229 & 265 have a different terminating point for different days of the week.

For current listing of NS Scheduled Trains click here... https://www.trainorders.com/discussion/read.php?2,2661357

Thanks for stopping by and always be safe when out track side!!!

Phil Maton
Villa Rica, GA




Date: 10/17/20 06:49
Re: Current Norfolk Southern Daily Scheduled Train Counts
Author: NYSWSD70M

This is viewed as progress!



Date: 10/17/20 07:51
Re: Current Norfolk Southern Daily Scheduled Train Counts
Author: RMD23

NYSWSD70 - I think you would need to also bring things like total daily car count, load/empty balance, and total number of intermodal boxes handled into the equation to determine if it is a progress or not.  A lot of trains running does not necessarily equal a well tuned operation. 



Date: 10/19/20 03:38
Re: Current Norfolk Southern Daily Scheduled Train Counts
Author: abyler

RMD23 Wrote:
-------------------------------------------------------
> NYSWSD70 - I think you would need to also bring
> things like total daily car count, load/empty
> balance, and total number of intermodal boxes
> handled into the equation to determine if it is a
> progress or not.  A lot of trains running does
> not necessarily equal a well tuned operation. 

We'd also need to know how much of the consolidation is the extension of trains to more distant terminals vs, the consolidation of trains between two terminals.



Date: 10/19/20 04:40
Re: Current Norfolk Southern Daily Scheduled Train Counts
Author: abyler

It's interesting how far the East-West consolidation has gone over the past 20 years.  Its not entirely clear how much of this was doubling traffic over the mountain to sort it at Conway and send it back before Enola was restarted.

Pre-Enola
10A/11A - Conway Reading
10G/11G - Conway Lancaster
10N/11K - Conway Allentown (still operating as 10K/34A)
12G/13G - Conway Harrington (still operating as 36A/37A)
14G/17G - Conway Morrisville (still operating as 38G/39G)
15G/16G - Conway Enola (still operating as 11V/12G)
18G/19G - Conway Oak Island