Eastern Railroad Discussion > CLNA Nash County SubDate: October 31, 2026 09:24PM CLNA Nash County Sub Author: scraphauler Carolina Coastal Railway (CLNA) Nash County Subdivision runs from Rocky Mount NC west to the town of Spring Hope, a distance of roughly 19 miles. Line was originally built in 1887 by the Wilmington and Weldon Railroad with the goal of connecting Rocky Mount to Raleigh, but never made it west of Spring Hope. The W&W was merged into the ACL in 1900 with ACL still holding out hope to reach Raleigh. In 1906, the Montgomery Lumber Company started building a private rail line connect to the ACL in Spring Hope over to Bunn NC and onto a quarry near Rolesville. In 1926, ACL purchased the Montgomery Lumber Company Railroad, making the quarry outside Rolesville the closest they ever got to Raleigh. By the late 1970s, SCL had abandoned the old Montgomery Lumber line, reverting back to the original W&W. In 1985, Laurinburg & Southern purchased the line, forming the Nash County Railroad. In 2005, Nash County attempted to abandon the western most 5 miles of line from Momeyer to Spring Hope, but NCDOT stepped in and purchased that piece, leasing it back to Nash County RR. In 2011, Nash County was sold to Carolina Coastal.
Today's Nash Counth sub serves a multi-customer Transload and a scrap yard in Rocky Mount, two poultry elevators and a bridge beam manufacture in Nashville, and a woodpulp yard on the NCDOT owned piece between Momeyer and Spring Hope. Also do car storage. Connection is made with CSX at the north end of Rocky Mount yard on the south side of downtown Rocky Mount. A haulage agreement with CSX allows the Nash County Sub to connect with the main part of the CLNA in Wilson NC. CLNA currently has 2 GP9s numbers 902 and 903, and a GP38-2 number 3801 assigned to the line. First two shots show the power in Nashville. Third shot shows one of the elevators. Edited 1 time(s). Last edit at 10/31/2026 09:35PM by scraphauler. Date: October 31, 2026 09:28PM Re: CLNA Nash County Sub Author: scraphauler Forth and fifth pic we see the pulpwood operation on the NCDOT owned portion of the line between Momeyer and Spring Hope. Sixth shot shows a couple pulp racks setting on main west of pulp yard, waiting their turn to spot and load. Looking west through the racks and down the "tree tunnel" you can see some stored covered hoppers.
Date: October 31, 2026 09:34PM Re: CLNA Nash County Sub Author: scraphauler Spring Hope is end of the line. An old BC Rail Caboose sits downtown and is slowly being refurbished by the town I believe. You can see the progress they've made in a month or two, First shot is several weeks ago, second is this past week. You can see the steps have been reinstalled, windows removed, and they've began priming in preparation for paint.
Date: November 01, 2026 03:12AM Re: CLNA Nash County Sub Author: ShortlinesUSA Glad to see them loading logs at Momeyer. There was concern they'd stop using that yard once the larger facility over on the CSX S-line opened and they did stop for a bit, but then seemed to randomly come back. Any insights on that traffic? Logs are getting to be a rare commodity on the rails.
Posted from Android Date: November 01, 2026 12:27PM Re: CLNA Nash County Sub Author: scraphauler ShortlinesUSA Wrote:
------------------------------------------------------- > Glad to see them loading logs at Momeyer. There > was concern they'd stop using that yard once the > larger facility over on the CSX S-line opened and > they did stop for a bit, but then seemed to > randomly come back. Any insights on that traffic? > Logs are getting to be a rare commodity on the > rails. > > Posted from Android The forrest product company that owns the pulp yard on CLNA has a similar yard in Youngsville NC on the CSX Norlina Sub (the former SAL Main aka S Line that is being rebuild/reinstalled as part of the R2R "Southeast Corridor" project), and has a much bigger location on the Aberdeen Sub of the S Line in Moncure NC that they recently built (rebuilt) rail into. Idea was the new Moncure yard could replace both Youngsville and Momeyer, allowing the, to both shut down. Problem is, there is still competition for logs in northetn North Carolina and Southern Virginia and the company started loosing logs to competitors as the competitors could offer less money and and still get the logs as the toothpick toaters were not willing to go to Moncure. Besides the obvious fuel cost issue for the greater distance, there is a big difference between coming out of the forrest, traversings a rural back road into a rural pulp yard vs having to go through a major metropolitan area via inerstate highways and great exposure to motor carrier enforcement officers. So, Momeyer and Youngsville have resumed rail, and as you see, Momeyer has a healthy inventory. Date: November 08, 2026 07:36AM Re: CLNA Nash County Sub Author: ctillnc Even if ACL had reached Raleigh, I don't know that there would have been enough traffic to sustain the branch over the long run. But suppose there was. This would have raised some interesting questions. Would Southern's trackage rights over ACL into the Tidewater have run direct Raleigh-Rocky Mount instead of via Selma? Would the Raleigh-Rocky Mount line be hosting the Silver Star/Floridian and Carolinian instead of running via Selma? Would the SEHSR concept of rebuilding the S-line to 110 mph have been replaced by a 110 mph Raleigh-Rocky Mount line and upgrades to Rocky Mount-Petersburg?
|