Eastern Railroad Discussion > FEC New Bridge on LineDate: November 04, 2026 08:55AM FEC New Bridge on Line Author: ICG On Saturday October 31 I took a ride to catch FEC train #204. When I arrived St. Augustine I noticed the newly constructed bridge was operational.
The old bridge has already been partially demolished. Here's a picture to show the new look of the San Sabastian Inlet crossing. Tom Paris St.Augustine FL Date: November 04, 2026 10:37AM Re: FEC New Bridge on Line Author: ICG I just heard that a bridge in Broward County was washed out during the heavy rain showers we have been getting lately.
I was wondering why the FEC trains up here on the north end have not been running. The FEC normally runs on a tight schedule. Tom Paris. St. Augustine FL Date: November 04, 2026 10:59AM Re: FEC New Bridge on Line Author: rbenko Brightline service is still suspended from WPB to Orlando, so you are probably correct.
Date: November 04, 2026 11:14AM Re: FEC New Bridge on Line Author: refarkas Wonderful image - A truly well-composed newsworthy scene.
Bob Date: November 04, 2026 11:40AM Re: FEC New Bridge on Line Author: timz Those are the old piers this side of the new?
With one big gap -- was it a drawbridge? Date: November 04, 2026 12:13PM Re: FEC New Bridge on Line Author: ShortlinesUSA Yes, those are the old piers in the foreground. No, it was not a drawbridge. The piers were spaced as you see toward the south end of the bridge (left part of the photo). Multiple piers at the north end have already been removed.
I'm frankly surprised how quickly demolition of the old bridge is progressing. I figured the old piers would stay awhile if not just get left in place. It's good they aren't for a host of reasons, boater safety among them. Posted from Android Edited 1 time(s). Last edit at 11/04/2026 12:13PM by ShortlinesUSA. Date: November 04, 2026 01:53PM Re: FEC New Bridge on Line Author: coach I'm surprised they didn't build the bridge higher, to account for sea level rise. It's already happening. In parts of Miami, the sea water is pushing up from the ground and flooding streets.
Date: November 04, 2026 02:35PM Re: FEC New Bridge on Line Author: Lackawanna484 coach Wrote:
------------------------------------------------------- > I'm surprised they didn't build the bridge higher, > to account for sea level rise. It's already > happening. In parts of Miami, the sea water is > pushing up from the ground and flooding streets. Maybe it's the angle, but it looks like the new bridge might be a little higher. There's a lot of concern about storm surge (wind driven high tides during storms) in building bridges, bulkheads, docks etc. Miami and Fort Lauderdale both have drainage problems and exposure to sea level rise. The proposed new bridge in Stuart, which has a lot of approach track on both sides, will be several feet higher. But that seems more to allow boats to pass underneath than any sea level rise. Date: November 05, 2026 06:17PM Re: FEC New Bridge on Line Author: baretables coach Wrote:
------------------------------------------------------- > I'm surprised they didn't build the bridge higher, > to account for sea level rise. It's already > happening. In parts of Miami, the sea water is > pushing up from the ground and flooding streets. Despite propaganda, the sea level at Miami and St. Augustine has only risen 8 inches since 1950. |