Home | Open Account | Help | 319 users online |
Member Login
Discussion
Media SharingHostingLibrarySite Info |
Passenger Trains > 7 of the 26thDate: 10/26/20 14:55 7 of the 26th Author: sethamtrak 821 and 157 with the winter consist. Out of Glenview at 14:43. Now all stopped at Pleasant Prairie at 16:55. I heard on the radio that two air hoses separated going over the Rondout diamonds. Not sure what's going on now....
Edited 1 time(s). Last edit at 10/26/20 16:36 by sethamtrak. Date: 10/26/20 19:43 Re: 7 of the 26th Author: MNR225 Left downtown Milwaukee at 6:57 PM (3 hours, 5 minutes late).
Posted from iPhone Date: 10/27/20 00:41 Re: 7 of the 26th Author: GenePoon 7(26) with the AMTK 821 and 157 suffered separated air hoses west of Rondout; took THREE HOURS to fix!?!?!?!?
Date: 10/27/20 09:06 Re: 7 of the 26th Author: jp1822 - Engine on #14 died before leaving LA Union Station
- Spare Engine on adjacent track - Took 4 HOURS to take the engine on the adjacent track and hook it up to consist #14 and proceed north. I guess a lot of things can go wrong in switching engines out or hooking up hoses. Date: 10/27/20 19:40 Re: 7 of the 26th Author: ProAmtrak Lets see, troubleshooting, calling CNOC, uh anything else that was a lot easier to do when they had the F40s?
|