Home | Open Account | Help | 211 users online |
Member Login
Discussion
Media SharingHostingLibrarySite Info |
Passenger Trains > Metra delays on Monday caused by CNDate: 10/01/24 04:40 Metra delays on Monday caused by CN Author: Englewood https://chicago.suntimes.com/transportation/2024/09/30/metra-delays-signal-problems
No paywall but you must watch a 15 second video to see the entire article Seems like a lot of mumbo jumbo to me. Was the PTC down or was the CTC system down? Why was the CN afraid to flag Metra trains through the diamonds where they are controlled by CN? Did I read something, somewhere, sometime, about not having single points of failure in critical infrastructure? Or was that a whiskey fueled dream ? From the article" Technology issues affected the Union Pacific Northwest, Milwaukee North, North Central Service and Heritage Corridor lines early Monday, the transit agency said. Thousands of commuters were affected by service cancellations and delays Monday morning on the Union Pacific Northwest, Milwaukee North, North Central Service and Heritage Corridor lines, a Metra spokesman said. The disruption was caused by the Canadian National Railway’s positive train control system. “Earlier this morning, an IT issue impacted CN’s train dispatching system in the U.S., including Metra and Amtrak trains. Date: 10/01/24 07:53 Re: Metra delays on Monday caused by CN Author: MaryMcPherson It shut everything down, causing lengthy delays to 58/59 and the cancelation of 390 / 391 as I understand it.
Posted from Android Mary McPherson Dongola, IL Diverging Clear Productions |