Passenger Trains > Mechanical Report 10/26 and 10/27


Date: November 01, 2026 11:06AM
Mechanical Report 10/26 and 10/27
Author: sethamtrak

The following information was sourced through a FOIA request and is public information. I do not work for Amtrak. 

2148(26) with Next Gen set 21 (cab cars 2148 and 2145) with 321 customers was stopped E of New Haven, CT at MP 77.74 with a report of a broken pantograph. After further inspection it was found to be a broken carbon strip and the pantograph  was in the cradle position. The crew was reconfiguring and de-preparing the trainset to proceed. HEP was down intermittently for 45 minutes while the crew worked to de-prepare the trainset. After 2148 was back on the move, electric techs inspected the area and reported a steady wire down across all four tracks west of Division Post on the metro north side. Metro North OK’ed tracks 1, 2 and 4 for diesel moves only. A shuttle set was readied in the event it was necessary to tow the equipment through the area. 1087 was held at Old Saybrook and 486 was held at New Haven. 1082, 1088 and 1194 were held in New Haven. 479, 486, 474 and 417 were cancelled entirely. Service recovery was initiated on all trains involved. Once the repairs were complete and power restored, traffic moved. Due to paperwork issues, 1087 cut engine 615 on New Haven and replaced it with 669. 1087 departed New Haven 7 hours and 59 mins late. Due to late operations, 1087 terminated in DC with one bus secured between DC and Norfolk. 1138(27) originated in DC with two buses as alternate transportation.

41(25) with engine 324, 320 and 11 cars was stopped near MP 134.9 near DC due to engine 324 stuck in penalty. Siemens desk helped troubleshoot and the train maintained HEP. Washington mechanical was on scene and assisted the crew. 47 min delay.

89(26) with engine 668 was delayed out of New York due to 668 being bad ordered for HVAC faults on both ends. 668 was dropped and swapped with 637. The train was further delayed die to car 81525 being bad ordered and replaced with 81513. 2 hour and 47 min delay.

11(25) was delayed enroute due to an ACE trespasser strike and lost time due to UP track and time territory between Lompoc Surf and Goleta. The train incurred a delay at Simi Valley, CA due to calendar day inspections. LA mechanical met the train to expedite the process. 2 hour and 12 min delay.

8(26) was scheduled to operate with engines 109 and 194 with 7 cars but was delayed out of Seattle due to mechanical issues affecting both engines. PTC issues on engine 109 and a blown traction motor on 194. BNSF 6949 was added to the head end and departed Seattle 3 hours late with 62 customers onboard.

329(26) with IDTX 4603, 4 cars and engine 205 with 52 customers was delayed out of Chicago due to MU train line alarms just prior to departure, Mechanical responded and corrected an issue on the MAP 100, restarted engine 205 which was not running and cleared the MU faults. 27 min delay. 332 with 110 customers was delayed 46 mins out of Milwaukee due to a late crew turn.

19(27) with engine 637, 8 cars and 121 customers was delayed S of BWI airport on track3 due to a MCB fault on engine 637. The crew recycled the engine twice to clear the fault before continuing on to DC. 39 min delay.

5(25) was delayed 2 miles N of Reno, NV due to loading issues on lead engine 69. The locomotive would intermittently stop loading causing HEP to drop. After multiple troubleshooting attempts failed, UP 7869 was added at Sparks to haul the train to Emeryville. 1 hour and 37 min delay.

22(26) with engine 310 and 6 cars was delayed 8 miles N of Alton, IL due to X-ITCS cut out and no map. The train was delayed due to running 79mph max. 45 min delay.

238(28) with engine 704, 105 and 5 cars was delayed departing Albany due to cab signal issues with engine 704. Albany mechanical was on scene to assist. It was determined to add engine 710 prior to departure. 46 min delay. This caused a 35 min late turn for 235.

572(28) and 587(28) were cancelled entirely due to an engine failure on unit 509 and no substitute equipment available in LA. Customers were reaccomdated on the next available services.

5(27) with engines 188 and 203 was delayed at Denver due to engine 188 shutting down. Mechanical restarted 188 and then it would not load. 56 min delay.

770(28) with 35 customers was stopped 1 mile S of Carpinteria, CA due to engine 2109 having multiple faults including a major engine fault that caused a shut down followed by a prelude pump error and a battery charger failure indication. Hep remained operational. Mechanical assisted the crew and engine 2109 was able to be restarted and resumed operation. 43 min delay.

11(26) was delayed enroute due to high tide conditions between San Jose and Salinas, CA and then police activity at Salinas as well as a work zone between Lompoc Surf and Goleta. The train was further delayed meeting 785 before Burbank. Calendar day inspections were performed and LA mechanical arrived to expedite the process 1 hour and 45 min delay.



Edited 1 time(s). Last edit at 11/01/2026 11:07AM by sethamtrak.






Date: November 01, 2026 01:53PM
Re: Mechanical Report 10/26 and 10/27
Author: mvrr10

Seth - thank you !



Date: November 02, 2026 05:51AM
Re: Mechanical Report 10/26 and 10/27
Author: Englewood

Re delay to 2150-26

What does "de-prepare" mean ?

Perhaps the NOC should quit the cutsey talk and they would get more respect.



Date: November 02, 2026 07:22AM
Re: Mechanical Report 10/26 and 10/27
Author: sethamtrak

Englewood Wrote:
-------------------------------------------------------
> Re delay to 2150-26
>
> What does "de-prepare" mean ?

I believe it is basically a hard reset of the equipment with regard to the Avelia sets. 



Date: November 02, 2026 07:56AM
Re: Mechanical Report 10/26 and 10/27
Author: Lackawanna484

Thank you for these reports.  The delay at Goleta for scheduled inspection is troubling. Isn't that kind of process supposed to be done at the service base, etc?

The carbon strip separation on the pantagraph for the NextGen is of concern, too. These trains are brand new. Why are the pans failing so early, or is this something that's supposed to be checked regularly and replaced as needed?



Date: November 02, 2026 08:29AM
Re: Mechanical Report 10/26 and 10/27
Author: mbrotzman

sethamtrak Wrote:
-------------------------------------------------------
> Englewood Wrote:
> -------------------------------------------------------
> > Re delay to 2150-26
> >
> > What does "de-prepare" mean ?
>
> I believe it is basically a hard reset of the
> equipment with regard to the Avelia sets. 

These reports frequently make use of the term "preparing" in regards to an NG trainset. I am unsure of the details, but there seems to be a complex trainset initialization process that is started by the crews when the train is being powered. It likely checks doors, brakes, HVAC, lighting, bathrooms, tilt (eventually) and some amount of propulsion. A de-prepare process would be a graceful shutdown of all of the above. 