Home Open Account Help 233 users online

International Railroad Discussion > Rebuilding of Cambodian Railroad and Thai connection moves ahead


Date: 02/15/18 19:02
Rebuilding of Cambodian Railroad and Thai connection moves ahead
Author: Soo715

After many political, financial and logistical delays, the restoration of rail service between Bangkok, Thailand and Phnom Penh, Cambodia (suspended since I think the early 1960s) is now rapidly moving forward. The rails are connected and being tested and through service should resume later this year.

The Cambodian rail line between Phnom Penh and the coast at Sihanoukville is already back in operation with a passenger train and some freight service.

http://www.khmertimeskh.com/50108708/northern-section-of-cambodian-western-rail-line-ready-for-test/?utm_source=Mekong+Eye&utm_campaign=147f4b4a62-EMAIL_CAMPAIGN_2018_01_10&utm_medium=email&utm_term=0_5d4083d243-147f4b4a62-380867501



Date: 02/17/18 12:37
Re: Rebuilding of Cambodian Railroad and Thai connection moves ah
Author: ATsf2921-4-8-4

Guess I'll add my small photographic collection.
September 1996 Battambang Cambodia.
First train from the capital made it in at that time in September after many years of absence.

If there is any interest please then post and I shall dd more photographs, says I.








Date: 02/19/18 07:20
Re: Rebuilding of Cambodian Railroad and Thai connection moves ah
Author: Soo715

Yes, those are awesome, would love to see more! I rode Phnom Phen to Battambang shortly before the line went out of service about 8 years ago....I'll try to post some photos as wel when I can...



Date: 02/20/18 09:13
Re: Rebuilding of Cambodian Railroad and Thai connection moves ah
Author: ATsf2921-4-8-4

Okay, here are some more.








Date: 02/20/18 09:20
Re: Rebuilding of Cambodian Railroad and Thai connection moves ah
Author: ATsf2921-4-8-4

....and some more says I.








Date: 02/28/18 02:23
Re: Rebuilding of Cambodian Railroad and Thai connection moves ah
Author: Soo715

That boxcar looks like the car we rode from Phnom Penh to Battambang!



Date: 02/28/18 09:18
Re: Rebuilding of Cambodian Railroad and Thai connection moves ah
Author: ATsf2921-4-8-4

Please note the yellow engine house directly above this posting.
Inside were two 2-6-0s (or maybe 4-6-0s been forgetting).
They were wood burners and had a Belgium builder's plate on each.
It was too dark to photograph them.
An elderly man was looking after them but I did not speak Khmer so I did not get their history. :-(
Luckily the Khmer Rouge had not harmed them, unlike the rusted and stripped 2-8-2 MacArthur engines depicted in the other photograph.
So say I.






[ Share Thread on Facebook ] [ Search ] [ Start a New Thread ] [ Back to Thread List ] [ <Newer ] [ Older> ] 
Page created in 0.0599 seconds