Home Open Account Help 386 users online

International Railroad Discussion > Train C119 (Brazil)


Date: May 29, 2026 10:14AM
Train C119 (Brazil)
Author: pedrop

On May 26, I could see the train C119 bringing empty container for limestone rocks that are loaded at the Multitex Co. in Nova Granja yard (ENG). These trains uses to receive the yard switchers of EVP at the rear end that are used to remove the containers from the train and insert them in the Multitex terminal. Here are some pictures and a video.

1)  VLI BB40-9WM 6050 and 6175 arriving in Nova Granja yard;

3) The yard switchers came in the rear end to help with the switching operations to take the cars to the Mutitex terminal.

Pedro Rezende
Vespasiano MG,









Date: May 29, 2026 10:20AM
Re: Train C119 (Brazil)
Author: pedrop

4) Here they go;

5) The Dash-9s near the Multitex terminal;

6) The video.

That's all for today.

Pedro

Pedro Rezende
Vespasiano MG,
https://youtube.com/c/minasgeraisrailways1



You must be a registered subscriber to watch videos. Join Today!




Date: June 12, 2026 12:05PM
Re: Train C119 (Brazil)
Author: RDC1

Nice sequence of photos. The dual gauge tracks are interesting.



Date: June 16, 2026 06:28PM
Re: Train C119 (Brazil)
Author: pedrop

Thanks!

RDC1 Wrote:
-------------------------------------------------------
> Nice sequence of photos. The dual gauge tracks are
> interesting.

Pedro Rezende
Vespasiano MG,
https://youtube.com/c/minasgeraisrailways1



[ Share Thread on Facebook ] [ Search ] [ Start a New Thread ] [ Back to Thread List ] [ <Newer ] [ Older> ] 
Page created in 0.0243 seconds