Home Open Account Help 488 users online

International Railroad Discussion > Kiwi Rail DL Full load Mission Bush Branch


Date: October 14, 2026 04:16PM
Kiwi Rail DL Full load Mission Bush Branch
Author: RogersPass

Hello
DL working hard out climbing Mission Bush, NZ, 2.5% grade with a 45kph curve off the main trunk line for approxiamately 1.5kms.
Just after the train goes passed where I was on the bridge, the track levels out but climbs again around the 10 km mark which is the same grade as the start
and the branch is 17 kms long.
Just adding up what was on the train it would have been around 1500 to 1600 tons.
Cheers Brian



Edited 1 time(s). Last edit at 10/14/2026 08:21PM by RogersPass.

You must be a registered subscriber to watch videos. Join Today!




Date: October 14, 2026 06:17PM
Re: Kiwi Rail DL Full load Mission Bush Branch
Author: pedrop

Nice video. What is in those freight cars? I noted the open top hopper are not full. Why?

Pedro Rezende
Vespasiano MG,
https://youtube.com/c/minasgeraisrailways1



Date: October 14, 2026 07:48PM
Re: Kiwi Rail DL Full load Mission Bush Branch
Author: RogersPass

Hi Pedrop, The cars next to the loco are full of Lime chip, which goes on the Coal stock pile,
which mix's with the coal and Iron sand to make Steel, The tank cars next to the chip are the Burnt Lime powder,
used to take the slag off the top of the steel before they pour the slab which has a lot of good minerals, .and behind the them is the Cars to take the 
coils to the port for export,  which are running back empty for reloading.That also is a big train  45 cars total with one loco on that grade
The cars may look half but are full as Lime Chip is Very heavy, Max load is around 55tons, plus the cars weigh total 70 tons.They use these cars
for coal also, which can be full to the top, much lighter.

Cheers Brian..



Edited 2 time(s). Last edit at 10/14/2026 08:00PM by RogersPass.



Date: October 14, 2026 08:54PM
Re: Kiwi Rail DL Full load Mission Bush Branch
Author: gaspeamtrak

Vert interesting ...Surprized by how many cars were on the train...:):):)



Date: October 15, 2026 01:30PM
Re: Kiwi Rail DL Full load Mission Bush Branch
Author: exhaustED

Awesome, we don't see enough NZ rail action!



[ Share Thread on Facebook ] [ Search ] [ Start a New Thread ] [ Back to Thread List ] [ <Newer ] [ Older> ] 
Page created in 0.0175 seconds