Home | Open Account | Help | 386 users online |
Member Login
Discussion
Media SharingHostingLibrarySite Info |
Western Railroad Discussion > Cement loads leaving Buda this morningDate: 12/12/18 16:59 Cement loads leaving Buda this morning Author: PALuvR I had an interesting morning on the UP Austin Sub in Buda, TX. After having breakfast, I drove trackside and was surprised to find a NB loaded cement train parked in Buda Pass. Previous loaded trains out of Texas Lehigh in Buda that I had seen left directly out of the plant. Buda Pass is a mile or so north of the plant.
1. Power for the loads was a pair of SD70Ms. 2. A northbounder with UP 8051, 6835 and an FXE unit trailing came through 3. More fresh paint Date: 12/12/18 17:03 Re: Cement loads leaving Buda this morning Author: PALuvR Crew van brought the conductor up to take off the derail and line the switch.
4. Lining the switch 5-6. Easing up and passing me Date: 12/12/18 17:21 Re: Cement loads leaving Buda this morning Author: PALuvR The conductor reset the derail and lined the switch back for the main. The train had to make a reverse move to clear the Main St. crossing (and pick up the conductor). He still had to walk a bit because the train had to stop short of the crossing seen in the distance in #3. Finally, with a full crew on board, the loads departed NB.
I appreciate y'all taking a look. Thanks Mike 7. Relining the switch 8. Reverse SB move to clear a blocked crossing 9. Ready to head out Date: 12/12/18 23:12 Re: Cement loads leaving Buda this morning Author: Ritzville Looks like you had an interesting day trackside Mike.
Larry Date: 12/13/18 06:04 Re: Cement loads leaving Buda this morning Author: texchief1 Nice shots, Mike!
Randy Lundgren Elgin, TX |