Home Open Account Help 238 users online

Western Railroad Discussion > A few NB at Black Butte


Date: 07/07/19 23:14
A few NB at Black Butte
Author: Skygevo

Photo 1-3  UP 6287 leads the second section of a NB at Black Butte 7/5/19








Date: 07/07/19 23:19
Re: A few NB at Black Butte
Author: Skygevo

Photo 4-5 getting ready to uncouple 

Photo 6 now uncoupled and pulling forward  getting ready to back up 








Date: 07/07/19 23:24
Re: A few NB at Black Butte
Author: Skygevo

Photo 7 UP 6287 by the watertower 

Photos 8 AND 9 UP 5306 leading the ZLCTM by the reattached manifest 








Date: 07/08/19 12:29
Re: A few NB at Black Butte
Author: TCnR

Nice work and that magic sunset light along with it.

The first operation has picked up the name 'splitter', where the empty train from Roseville is split into two sections in Dunsmuir, there's a set of 'helpers' in town that takes the second section to Black Butte where they put the train back together. The operation had been from Lakehead to Grass Lake but they've figured out it works just as well from Dunsmuir to Black Butte. This is basically because of the tight curve and ruling grade at Cantara Loop to Mott.

Yep, it's very similar to what the SP did at times.



Date: 07/09/19 20:52
Re: A few NB at Black Butte
Author: Graybeard1942

Is there still a lunar signal at the Black Butte crossover?



[ Share Thread on Facebook ] [ Search ] [ Start a New Thread ] [ Back to Thread List ] [ <Newer ] [ Older> ] 
Page created in 0.0351 seconds