Home Open Account Help 367 users online

Western Railroad Discussion > The Double-Derail Challenge


Date: 10/09/20 17:18
The Double-Derail Challenge
Author: bmarti7

The crew of the BNSF X-LVWELR has just pulled 116 empty grain hoppers into the siding at Eldridge, ND. They have pulled the head-end power and run around the train to place all the BNSF power on the west end of the siding. This particular siding has two derails so the challenge is to tie down the power between the derails. The crew accomplished the task with feet to spare. 

1. the engineer prepares to pull the DPU away from the train far enough to clear the derail.
2. The DPU has been moved and the derail thrown
3. Success - with the units coupled together, the hand brakes set and the cabs locked, it's time to move on

Bismarck Bill 
 



Edited 1 time(s). Last edit at 10/09/20 17:23 by bmarti7.








Date: 10/09/20 20:04
Re: The Double-Derail Challenge
Author: SCKP187

Nice close detail shots and story to explain the work performed.
Brian Stevens



[ Share Thread on Facebook ] [ Search ] [ Start a New Thread ] [ Back to Thread List ] [ <Newer ] [ Older> ] 
Page created in 0.0328 seconds