Home Open Account Help 375 users online

Western Railroad Discussion > Joint Line heads up/ Circus in town


Date: 01/18/21 08:35
Joint Line heads up/ Circus in town
Author: SD45X

Double load leaving Denver. Yesterday morning they broke a Q load combo in three places at the lake. Bring refreshments:)



Date: 01/18/21 12:26
Re: Joint Line heads up/ Circus in town
Author: SD45X

Same results:) fixing it now at Palmer Lake



Date: 01/18/21 17:22
Re: Joint Line heads up/ Circus in town
Author: shadetree

These are the times we live in.  Common sense is dead.

Eng.Shadetree



Date: 01/18/21 18:52
Re: Joint Line heads up/ Circus in town
Author: slug96

Double load broke into two going over Palmer. Then, once it was put back together, it broke into three. Crew asked to unlink the DP motors to run it as two trains. Dispatcher said they have to run it over the hill as one train. It took the train 6.5 hrs to go from Palmer Lake to Monument.

With one train behind it, and 4 northbound coming at it, it resulted in 5 dog catch crews.

Posted from Android



Date: 01/19/21 16:44
Re: Joint Line heads up/ Circus in town
Author: 3rdswitch

They did break it into two trains. Yes it took the first half six plus hours to get to Monument, but, the second half backed north of the signals at Palmer Lake, and didn't head south until 2330 hrs, almost eleven hours after going into emergency. Sometimes they learn and sometimes they don't.
JB



[ Share Thread on Facebook ] [ Search ] [ Start a New Thread ] [ Back to Thread List ] [ <Newer ] [ Older> ] 
Page created in 0.03 seconds