Latest on SMART Extension to Windsor on NWP.
Author: weather

A dispute on how toll bridge authority money should be distributed is now before the california Supreme Court.  $40 million is destined for the 3 miles extension from Airport Blvd. north of Sants Rosa. However, work has stopped for now and the opening of this segment is delayed until 2022.  First image shows the two main bridges on the extension about a half mile south of the Windsor Depot. Most of the new railroad inncludes double track beginning at SMARTS Railroad Operation Center. Image 2: SMART will use the first storage track in the yard to connect the double track on the south end. The bumber has not be removed yet to connect the track. Image 3: Looking north at Airport Road, the 2 tracks only extend a short distance north.  The track and ROW is arrow straight right into Windsor and beyond.



Edited 2 time(s). Last edit at 02/18/21 10:14 by weather.








Date: 02/17/21 23:02
Re: Latest on SMART Extension to Windsor on NWP.
Author: weather

Imager four:  this is the crossing at Airport Blvd. showing both tracks now in place.  Image 5:  The downtown crossing in Windsor is also complete, however the track between the ROC at Airport Blvd. and downtown Windsor has yet to be laid.  Text and Phots by Mike Pechner






Date: 02/18/21 09:56
Re: Latest on SMART Extension to Windsor on NWP.
Author: phthithu

Very interesting post, Weather. That's neat to see the connection on the north side of the ROC. 



Date: 02/18/21 15:25
Re: Latest on SMART Extension to Windsor on NWP.
Author: spider1319

I appreciate the updates and the pics.I am looking forward to more.Bill Webb



Date: 02/18/21 16:19
Re: Latest on SMART Extension to Windsor on NWP.
Author: callum_out

It's just amazing that the anti-freight SMART people, now that they've run off the previous operator, can't wait to spend money putting
in new industrial sidings. 

Out 



Date: 02/18/21 16:39
Re: Latest on SMART Extension to Windsor on NWP.
Author: PHall

callum_out Wrote:
-------------------------------------------------------
> It's just amazing that the anti-freight SMART
> people, now that they've run off the previous
> operator, can't wait to spend money putting
> in new industrial sidings. 
>
> Out 

But have they "run off" the previous operator?
My understanding is that the folks who ran the NWP are now still running it but as contractors to SMART.



Date: 02/18/21 16:45
Re: Latest on SMART Extension to Windsor on NWP.
Author: callum_out

Yes, but the former owners of the NWP were constantly trying to get SMART to reinstall switches to service customers little
of which actually happened. Now with SMART in control of freight operations things are changing. The current operator is
only temporarilty current.

Out 



Date: 02/18/21 21:27
Re: Latest on SMART Extension to Windsor on NWP.
Author: hawker95

SMART hasn't assumed control yet, it's still NWP people doing NWP stuff under NWP business. STB has to approve the transfer.

callum_out Wrote:
-------------------------------------------------------
> Yes, but the former owners of the NWP were
> constantly trying to get SMART to reinstall
> switches to service customers little
> of which actually happened. Now with SMART in
> control of freight operations things are changing.
> The current operator is
> only temporarilty current.
>
> Out 



Date: 02/19/21 20:05
Re: Latest on SMART Extension to Windsor on NWP.
Author: callum_out

That's correct, the exemption efective date is March 4th.

Out 