Home Open Account Help 264 users online

Western Railroad Discussion > All UP Power on BNSF Brush Subd 28 Feb 2024


Date: 02/28/24 10:16
All UP Power on BNSF Brush Subd 28 Feb 2024
Author: cozephyr

Union Pacific 6945 East 3x2 Arizona Electric Power from Rincon, New Mexico, coal empty on BNSF.  Train took Barr Siding 10:45 AM.  ​BNSF running E DCHESM-001A with 114-empties.  Left Denver 10:20 AM, 28 February 2024 on the Brush Subdivision-!



Edited 5 time(s). Last edit at 02/28/24 10:21 by cozephyr.






Date: 02/28/24 10:33
Re: All UP Power on BNSF Brush Subd 28 Feb 2024
Author: Keith_Kevet

Coal empty from the Apache Generating Station at Cochise, AZ.

Located on the ex-SP Sunset Line west of Willcox, AZ. At one time the generating station received all of its coal from New Mexico, delivered to the SP at Deming by the Santa Fe.


Keith_Kevet

Posted from Android



Edited 1 time(s). Last edit at 02/28/24 10:36 by Keith_Kevet.



Date: 02/28/24 15:29
UP Power on BNSF Brush Subd Keenesburg, CO, 28 Feb 2024
Author: cozephyr

Eastbound Union Pacific 6945, AC4460CW, led detoured over BNSF an Arizona Electric Power from Cochise, Arizona, train on BNSF's Brush Subdivision.  The 114-car empty unit coal train was running 3x2 near Keenesburg, Colorado, 28 February 2024.  Rear DPU power was UP 8172.  Train headed for the Peabody Coal owned North Antelope Mine, WY, to load.



Edited 1 time(s). Last edit at 03/03/24 03:58 by cozephyr.






Date: 02/29/24 06:07
Re: UP Power on BNSF Brush Subd Keenesburg, CO, 28 Feb 2024
Author: SP8595

Very Strange!



[ Share Thread on Facebook ] [ Search ] [ Start a New Thread ] [ Back to Thread List ] [ <Newer ] [ Older> ] 
Page created in 0.0467 seconds