Home Open Account Help 281 users online

Western Railroad Discussion > Some had to ride the rails on Thanksgiving


Date: 11/29/24 18:05
Some had to ride the rails on Thanksgiving
Author: highgreengraphics

Yesterday's UP 02 LaSalle - Fort Collins, CO Local was business as usual yesterday as the crew and train delivered loaded covered cement hoppers to the Holcim Cement loadout at the end of the Fort Collins Branch/Industrial Lead at Boettcher, CO. Photo 1 - Backing up the steep grade to the small cement plant yard. Photo 2 - After securing the loads, backing to the Boettcher switch with empties and "snoot" SD40-2 1820 leading. In the background are more loads to shove uphill since the train was longer than the 14 cars maximum upgrade to the plant. === === = === JLH 






Date: 11/29/24 20:35
Re: Some had to ride the rails on Thanksgiving
Author: Mike6640-2

Geat shots of both units!!



Date: 11/29/24 21:56
Re: Some had to ride the rails on Thanksgiving
Author: pdt

Double time.



Date: 11/30/24 17:42
Re: Some had to ride the rails on Thanksgiving
Author: SP8595

Snoots rule:)



Date: 11/30/24 20:37
Re: Some had to ride the rails on Thanksgiving
Author: Texican65

Cool pics!

I was on a Z Thanksgiving day….definitely no extra, double, or holiday pay…. all straight time! Company says I was lucky to be able to even come in that day and move freight.



Date: 12/03/24 13:35
Re: Some had to ride the rails on Thanksgiving
Author: ns1000

Nice pics!!



Date: 12/03/24 15:30
Re: Some had to ride the rails on Thanksgiving
Author: shadetree

"Thanksgiving?  You should be thankful to have a job."-- Local Trainmaster

Eng.Shadetree



[ Share Thread on Facebook ] [ Search ] [ Start a New Thread ] [ Back to Thread List ] [ <Newer ] [ Older> ] 
Page created in 0.032 seconds