ORHC - patio progress
Author: asheldrake

of need for tilting to normal........contractors are pushing to get the ORHC entry patio ready for Train Day 5/10/2025.   Yes, it will be a big deal.    Arlen



Date: 04/25/25 16:32
Re: ORHC - patio progress
Author: 2-10-2

...




Date: 04/26/25 13:39
Re: ORHC - patio progress
Author: Jsporseen

Here are three more pics:

#1 - taken from between the two flag poles showing nine bases for signals.  Looks like they will all operate as there seems to be electricity for each.  I've been told that they have a  wig-wag signal so it might be fun if they had a switch to start wigging and wagging a little before and during the  operation of the turntable.
#2 - from the gated entrance showing some of the safety fence meant to prevent visitors from getting too close to the pit.
#3 - the TT Bridge with the safety railing on either side.  (that is something that Wes Camp and I both were interested in seeing)

JOHN



Edited 3 time(s). Last edit at 05/02/25 10:08 by Jsporseen.