Home | Open Account | Help | 324 users online |
Member Login
Discussion
Media SharingHostingLibrarySite Info |
Railfan Gaming > Eastbound Intermodal on Stevens Pass Part 3Date: 12/01/08 18:39 Eastbound Intermodal on Stevens Pass Part 3 Author: AmtrakPalmetto Ran this Z-SSECHC9-26A over Stevens Pass, and decided to take some "photos" along the route. Speed stayed in the 15mph range while climbing the grade. Enjoy the photos.
Details: BNSF ES44AC #6238 CSX AC6000CW #609 CSX SD80MAC #806 BNSF ES44AC #6135 100 platforms 7258 tons 8490 feet One thing I calculated is that a train requires 1.8755497kw / US ton to make it over Stevens Pass, at a speed of about 15mph. This is for Microsoft Train Simulator purposes only. Photo 1: Crossing a bridge by the West end of Berne. Photo 2: In-cab view of East end of Berne. Photo 3: Looking back at the train by milepost 1698. Date: 12/01/08 18:41 Re: Eastbound Intermodal on Stevens Pass Part 3 Author: AmtrakPalmetto Photo 4: Now in dynamics coming down the grade, we are about to enter a tunnel at milepost 1697.
Photo 5: Locomotives crossing a bridge by milepost 1696.5 Photo 6: Dwarfed by the surrounding mountains, the train weaves its way down the grade by milepost 1694. Date: 12/01/08 18:44 Re: Eastbound Intermodal on Stevens Pass Part 3 Author: AmtrakPalmetto Photo 7: In-cab view of the West end of Merritt, end of 25mph speed and beginning on 45mph speed.
Photo 8: In-cab view of Merritt Wye and East end of Merritt, now at a steady 45mph. Photo 9: In-cab view of West end of Winton. Date: 12/01/08 18:47 Re: Eastbound Intermodal on Stevens Pass Part 3 Author: AmtrakPalmetto Photo 10: Train passing Winton Lumber and East end of Winton.
Photo 11: Locomotives crossing over a freeway Photo 12: In-cab view of the valley by milepost 1283. Date: 12/01/08 18:49 Re: Eastbound Intermodal on Stevens Pass Part 3 Author: AmtrakPalmetto Photo 13: Crossing a beautiful truss bridge.
Photo 14: Looking back at the train still coming out of the tunnel by milepost 1680. Photo 15: Foamer view of the locomotives. Date: 12/01/08 18:51 Re: Eastbound Intermodal on Stevens Pass Part 3 Author: AmtrakPalmetto Photo 16: In-cab view of a railroad crossing by milepost 1678.
Photo 17: In-cab view of Leavenworth set-out track and East end Leavenworth. Photo 18: Paralelling a river by milepost 1669. I hope you enjoyed this photo essay. Stay tuned for more! |