Eastern Railroad Discussion > Tunnel modification for NGPDate: 11/14/12 22:25 Tunnel modification for NGP Author: sandpatch25 How does CSX modify tunnels that can't be daylighted for the National Gateway Project? Do they lower the right-of-way's elevation by several feet or what?
Edited 1 time(s). Last edit at 11/14/12 22:27 by sandpatch25. Date: 11/15/12 04:01 Re: Tunnel modification for NGP Author: LoadLimited Point Of Rocks, and Catoctin undercut. Harpers Ferry, Randolph, Stuart, Graham, and Carothers are getting notched out to accommodate double stacks.
Also, the old ex-WM overhead bridge at North Branch is coming down. Posted from iPhone Date: 11/15/12 08:14 Re: Tunnel modification for NGP Author: sandpatch25 Does anyone have any photos of their modified state? It sounds like their visual appearence will be drastically less photogenic.
Edited 1 time(s). Last edit at 11/15/12 13:25 by sandpatch25. Date: 11/15/12 13:12 Re: Tunnel modification for NGP Author: sonderweg Nothing from Harpers Ferry eastward has been touched. Also, as I recall, only two of the four tunnels on the Magnolia Cutoff have been touched. The WM Bridge was still there as of a few weeks ago, though contractors were hauling in dirt to build a new storage track to replace the function of the WM bridge.
In short, there are few photos of notched/altered tunnels because very little has been done overall. sandpatch25 Wrote: ------------------------------------------------------- > Does anyone have any photos of their modified > state? Date: 11/15/12 19:31 Re: Tunnel modification for NGP Author: Gonut1 Point of Rocks, lowered? It is already flood prone. Whatever, that just means more reroutes via NS across the former PRR main in extreme weather and with all of this global warming NS stands to make big bucks!