Eastern Railroad Discussion > Ridgeway, OH new connectionDate: 11/19/12 19:25 Ridgeway, OH new connection Author: exopr I heard from a pretty good source that CSX has begun work on the connection in the Northeast corner at Ridgeway, OH. When finished, the Marion-North Baltimore segments of Q106 and 107 will use this connection instead of the present routing via Fostoria which requires a time-consuming back-up move at Marion. Sounds like the OC north of Ridgeway will be a good place to shoot KCS Belles, with the N. Baltimore-St Louis segments of Q106 & 107 already operating that way.
Date: 11/19/12 20:00 Re: Ridgeway, OH new connection Author: MDH The Toledo Branch already is a good place to shoot Belle's (by Ohio standards!) and there's definitely some heavy duty construction going on at Ridgeway with several dump trucks and a bunch of guys at work when I was there this last Saturday. Here's a Q107 swinging around the connection to head west with the tail end of the train coming off the Branch visible to the left of the leader.
Regards, Michael Date: 11/20/12 03:36 Re: Ridgeway, OH new connection Author: farmer Both turnouts were installed on 11-19. Also once track is completed it will be used as hand throw turnouts in and out of transfer.
Edited 1 time(s). Last edit at 11/20/12 05:44 by farmer. Date: 11/20/12 04:30 Re: Ridgeway, OH new connection Author: jmbreitigan Nice shot, nice to see those signals on the right.
John Date: 11/20/12 07:22 Re: Ridgeway, OH new connection Author: CGTower Hoping to fly over here in a few weeks...
Interesting...one would have thought a least a power operated switch on the Bee Line side...but I guess that would mean a signal, etc, etc...etc... Wonder if they will dispatch a crew van out to Ridgeway every time they need to use the connection. CG Tower farmer Wrote: ------------------------------------------------------- > Both turnouts were installed on 11-19. Also once > track is completed it will be used as hand throw > turnouts in and out of transfer. Date: 11/20/12 07:28 Re: Ridgeway, OH new connection Author: farmer Signal cutover will be in second quarter of 2013.. Transfer is to be put in service asap
Posted from Android Date: 11/20/12 08:57 Re: Ridgeway, OH new connection Author: CGTower Excellent, thanks!
CG farmer Wrote: ------------------------------------------------------- > Signal cutover will be in second quarter of 2013.. > Transfer is to be put in service asap > > Posted from Android |