I heard from a pretty good source that CSX has begun work on the connection in the Northeast corner at Ridgeway, OH. When finished, the Marion-North Baltimore segments of Q106 and 107 will use this connection instead of the present routing via Fostoria which requires a time-consuming back-up move at Marion. Sounds like the OC north of Ridgeway will be a good place to shoot KCS Belles, with the N. Baltimore-St Louis segments of Q106 & 107 already operating that way.



Date: 11/19/12 20:00
Re: Ridgeway, OH new connection
Author: MDH

The Toledo Branch already is a good place to shoot Belle's (by Ohio standards!) and there's definitely some heavy duty construction going on at Ridgeway with several dump trucks and a bunch of guys at work when I was there this last Saturday. Here's a Q107 swinging around the connection to head west with the tail end of the train coming off the Branch visible to the left of the leader.

Regards,
Michael




Date: 11/20/12 03:36
Re: Ridgeway, OH new connection
Author: farmer

Both turnouts were installed on 11-19. Also once track is completed it will be used as hand throw turnouts in and out of transfer.



Edited 1 time(s). Last edit at 11/20/12 05:44 by farmer.



Date: 11/20/12 04:30
Re: Ridgeway, OH new connection
Author: jmbreitigan

Nice shot, nice to see those signals on the right.
John



Date: 11/20/12 07:22
Re: Ridgeway, OH new connection
Author: CGTower

Hoping to fly over here in a few weeks...

Interesting...one would have thought a least a power operated switch on the Bee Line side...but I guess that would mean a signal, etc, etc...etc...

Wonder if they will dispatch a crew van out to Ridgeway every time they need to use the connection.

CG Tower

farmer Wrote:
-------------------------------------------------------
> Both turnouts were installed on 11-19. Also once
> track is completed it will be used as hand throw
> turnouts in and out of transfer.



Date: 11/20/12 07:28
Re: Ridgeway, OH new connection
Author: farmer

Signal cutover will be in second quarter of 2013.. Transfer is to be put in service asap

Posted from Android



Date: 11/20/12 08:57
Re: Ridgeway, OH new connection
Author: CGTower

Excellent, thanks!

CG


farmer Wrote:
-------------------------------------------------------
> Signal cutover will be in second quarter of 2013..
> Transfer is to be put in service asap
>