Home Open Account Help 324 users online

Eastern Railroad Discussion >


Date: 10/14/14 03:51

Author: blackcatd9

RU CT: Worcester MA to Boston MA – 10/14/2014
RED CONSIST: 60 Cars = 4 Stocks, 35 Coaches, 2 COFC, 19 Flats. (Total 256 axles less power)

REMINDER: RBBB Rail Transportation Routings (RTR’s) and Times are made in advance and Subject to Change (STC) without notice as the host railroad(s) require. ROUTINGS AND TIMES ARE UNPREDICTABLE, a lot can change during departure, although the CT’s are to run ahead of schedule if the host RR’s can accommodate. Crew Changes, Service Stops and Consist Rearrangement can occur anywhere or anytime along the route at the discretion of the operating/transportation officials.

“The Network” will try to provide the “Projected Routing” (NPR) when and as data is received.
As of this Post Time NPR appears to be the same as in “2013”. Power can be whatever is available by carrier.
RUCT from Worcester MA to Boston MA.
P&W responsible for the assembly of the RUCT with handoff to CSXT.
CSXT Depart WORCESTER, MA – Tuesday, 10/14/14
CSXT Arrive BOSTON, MA – Tuesday, 10/14/14
NOTE: In the event RUCT cannot make schedule, will hold for morning commuter traffic.
From “Tower 48”: The CT (2013) usually puts up on the Grand Junction Running Track between Mass Avenue and Memorial Drive and will leave both the Fort Washington and Pacific Street pedestrian crossings open. As in recent practice the CT will likely be placed on the mainline, with all other rail traffic going around it via the passing siding (Amtrak, MBTA and CSX moves). Some of the circus train - the flats and containers - will use whatever in available and/or in service at Beacon Park Yard due to height restrictions. CT (2013) is in Beacon Park most on TV-2 rest of CT on the Grand Junction.

TO.COM REFERENCE: http://www.trainorders.com/discussion/read.php?2,3546025 = 10/11/2014

NOTE: As stated in “REMINDER” above, ROUTES and DEPARTURE TIMES are always subject to change without notice.

Corrections and New Information are always needed and welcome on these runs for Updating Data, Photo and Video Opportunity. Routings and Times are always subject to change (STC).
Field Reports Needed. Enjoy. All for now. bcd9 ∑:=)



[ Share Thread on Facebook ] [ Search ] [ Start a New Thread ] [ Back to Thread List ] [ <Newer ] [ Older> ] 
Page created in 0.0409 seconds