Home Open Account Help 230 users online

Eastern Railroad Discussion > RU CT: Bridgeport CT to Rochester NY - 10/27/2014


Date: 10/27/14 06:41
RU CT: Bridgeport CT to Rochester NY - 10/27/2014
Author: blackcatd9

RU CT: Bridgeport CT to Rochester NY - 10/27/2014
RED CONSIST: 60 Cars = 4 Stocks, 35 Coaches, 2 COFC, 19 Flats. (Total 256 axles less power)

REMINDER: RBBB Rail Transportation Routings (RTR’s) and Times are made in advance and Subject to Change (STC) without notice as the host railroad(s) require. ROUTINGS AND TIMES ARE UNPREDICTABLE, a lot can change during departure, although the CT’s are to run ahead of schedule if the host RR’s can accommodate. Crew Changes, Service Stops and Consist Rearrangement can occur anywhere or anytime along the route at the discretion of the operating/transportation officials.

“The Network” will try to provide the “Projected Routing” (NPR) when and as data is received.
As of this Post Time NPR appears to be the same as in “2013”. Power can be whatever is available by carrier.
This will be an approximate 450 Mile run for the RUCT.
CSXT/CSO will assemble the consist and depart New Haven, CT. CSXT will be the carrier for the run to Rochester, NY. Past practice CSXT will spot the Flats for loadout, upon completion CSXT will proceed to Cedar Hill and assemble the RUCT. After the consist is assembled CSO depart New Haven Terminal and proceed to West Springfield, MA and handoff CT to CSXT. As in the past the Rochester and Southern Railroad (RSR) will breakdown the CT for offloading and storage. CSXT look for a P900-27 Series RUCTID.
CT: New Haven, Hartford, Windsor Locks.
MA: W. Springfield, Westfield, Hinsdale, Pittsfield.
NY: Chatham, Selkirk, Fonda, Utica, Syracuse, Lyons, Newark, Rochester.
CSXT upon arrival in Rochester (Tuesday) to handoff RUCT to Rochester and Southern RR (RSR) for breakdown and storage.

NOTE: As stated in “REMINDER” above, ROUTES and DEPARTURE TIMES are always subject to change without notice.

TO.COM REFERENCE: http://www.trainorders.com/discussion/read.php?2,3559342 = 10/25/2014

Corrections and New Information are always needed and welcome on these runs for Updating Data, Photo and Video Opportunity. Routings and Times are always subject to change (STC).
Field Reports Needed. Enjoy. All for now. bcd9 ∑:=)



Date: 10/28/14 04:43
Re: RU CT: Bridgeport CT to Rochester NY - 10/27/2014
Author: blackcatd9

28 Oct 14 (Tuesday) – 01:00 AM EDT – Fort Plain, NY – RUCT (P925-27) by CP 198 (Palentine Bridge, NY – MP QC 198.8), Rochester Subdivision.
bcd9 ∑:=)



[ Share Thread on Facebook ] [ Search ] [ Start a New Thread ] [ Back to Thread List ] [ <Newer ] [ Older> ] 
Page created in 0.0414 seconds