Home | Open Account | Help | 387 users online |
Member Login
Discussion
Media SharingHostingLibrarySite Info |
Eastern Railroad Discussion > Herzog's MPM unloading rail @ Landsdown Jct.Date: 11/24/15 15:15 Herzog's MPM unloading rail @ Landsdown Jct. Author: Pattenburg Stopped by the Landsdown Road grade crossing near Clinton, NJ on Tuesday morning and observed Herzog's Multi-Purpose Machine (MPM) unloading rail along NS's Lehigh Line near MP 57 while parked on the siding. In the background can be seen Herzog 202 which started its railroad life back in October, 1971 as B&O 4031.
Date: 11/24/15 15:23 Re: Herzog's MPM unloading rail @ Landsdown Jct. Author: Out_Of_Service looks like 39footers ... what's the rail for ??? ...
Date: 11/24/15 16:02 Re: Herzog's MPM unloading rail @ Landsdown Jct. Author: Pattenburg Have no idea as to what that rail is being used for.
Date: 11/24/15 18:30 Re: Herzog's MPM unloading rail @ Landsdown Jct. Author: DocJohn Picture of the area from Google Maps (https://www.google.com/maps/@40.6072522,-74.9149942,170m/data=!3m1!1e3) shows evidemce of a second siding being there at one time.
John Date: 11/25/15 07:32 Re: Herzog's MPM unloading rail @ Landsdown Jct. Author: bioyans Pattenburg Wrote:
------------------------------------------------------- > Have no idea as to what that rail is being used > for. It is old welded rail that Herzog has been out cutting up and picking up. From the looks of it, they are moving it to locations where it can be loaded onto a flatbed trailer for transport. They were doing that a couple days ago in Reading, and this looks like it is the same process. There are quite a few locations where rail was replaced, and the old rail sat for some time. NS probably contracts with Herzog to come take care of it all at once, and then ship it out in bulk to wherever/whoever it is going to. |