Home Open Account Help 340 users online

Eastern Railroad Discussion > Amtrak 42 headed east late with NS power


Date: 06/21/16 06:23
Amtrak 42 headed east late with NS power
Author: woytek

I posted this in the passenger forum, but thought it might be useful here, too.

Heads up: Amtrak #42 departed Pittsburgh around 9:05AM with NS 4727 on the head end. 4727 rolled by westbound light sometime around 7:30. I didn't have my radio today so the issue with the Amtrak unit is unknown. NS 4727 is sporting green "swoosh" environment friendly paint scheme.

Jonathan

Posted from Android



Date: 06/21/16 08:26
Re: Amtrak 42 headed east late with NS power
Author: reel_smooth

Just now passing Cresson - that's late and then some!



Date: 06/21/16 10:22
Re: Amtrak 42 headed east late with NS power
Author: EL-SD45-3632

What's up with all of the late running Amtrak trains? equipment issues or the host railroad...



Date: 06/21/16 10:29
Re: Amtrak 42 headed east late with NS power
Author: reel_smooth

EL-SD45-3632 Wrote:
-------------------------------------------------------
> What's up with all of the late running Amtrak
> trains? equipment issues or the host railroad...

For this one, it would appear to be an equipment issue.

** I should, while I'm at it, ask the next question, in case anyone knows: will it stay on past Harrisburg? **

Posted from iPhone



Edited 1 time(s). Last edit at 06/21/16 10:34 by reel_smooth.



Date: 06/21/16 10:42
Re: Amtrak 42 headed east late with NS power
Author: cr2581

Cab signal failure on Amtrak engine 88.  The NS unit will come off in Harrisburg on arrival and the Amtrak protect diesel will be added ahead.



Date: 06/21/16 10:59
Re: Amtrak 42 headed east late with NS power
Author: Lackawanna484

cr2581 Wrote:
-------------------------------------------------------
> Cab signal failure on Amtrak engine 88.  The NS
> unit will come off in Harrisburg on arrival and
> the Amtrak protect diesel will be added ahead.

Thanks.

is this one of the units converted to ASCES equipment compatibility?
 



Date: 06/21/16 11:10
Re: Amtrak 42 headed east late with NS power
Author: reel_smooth

cr2581 Wrote:
-------------------------------------------------------
> Cab signal failure on Amtrak engine 88.  The NS
> unit will come off in Harrisburg on arrival and
> the Amtrak protect diesel will be added ahead.

Thank you. Would have loved to have seen it go to Philly, but, it is what it is.



Date: 06/21/16 11:28
Re: Amtrak 42 headed east late with NS power
Author: PRR-Lewistown

Lewis. 2:10

Posted from Android



Date: 06/21/16 11:44
Re: Amtrak 42 headed east late with NS power
Author: woytek

At the time, I wondered if it had something to do with the signal crew at CP BLOOM, but when I saw the NS unit on the head end, I figured that wasn't the issue. Thanks for the updates on what happened. I love this place. 

Here are a few photos, for those who might be interested...

#1 NS 4727, a GP35ECO, rolls toward Pennsylvania Station around 7:30AM.
#2 The Pennsylvanian, #42, finally departs Pittsburgh almost two hours late.
#3 The Pennsylvanian rounding the curve through CP Bloom.








Date: 06/21/16 11:52
Re: Amtrak 42 headed east late with NS power
Author: sp8192

Well that's pretty neat!  There's a first time for everything!



Date: 06/21/16 13:20
Re: Amtrak 42 headed east late with NS power
Author: railcity

Why was 2 hours if the NS engine arrive at Pittsburgh Station at 7:30 A.M.? What was they doing at station for 2 hours?? Amtrak Crew or NS Crew Today.



Date: 06/21/16 13:56
Re: Amtrak 42 headed east late with NS power
Author: Lackawanna484

railcity Wrote:
-------------------------------------------------------
> Why was 2 hours if the NS engine arrive at
> Pittsburgh Station at 7:30 A.M.? What was they
> doing at station for 2 hours?? (snip)

I heard they were waiting for a VIP.



Date: 06/21/16 16:17
Re: Amtrak 42 headed east late with NS power
Author: mp109

I wonder if in these cases does the Amtrak engineer run the engine alone or does an NS engineer go along? Maybe the time was used for the NS engineer to instruct the Amtrak engineer on how to run the engine! LOL

Posted from Android



Date: 06/21/16 18:45
Re: Amtrak 42 headed east late with NS power
Author: resqjon

The reason for the delay was because the 4727 is not approved to run on the NEC, so many phone calls and negotiations between Amtrak and NS ensued. The end result was they let the 4727 on the train and 42 was only allowed into State Interlocking after receiving a Form D authorizing an unauthorized locomotive into the station.

Jon



Date: 06/22/16 04:52
Re: Amtrak 42 headed east late with NS power
Author: RRTom

Train was EB past Exton PA with two Amtrak engines in front around 6PM+/-. That's more than 2 hours late.

(corrected to say EB)



Edited 1 time(s). Last edit at 06/22/16 05:54 by RRTom.



Date: 06/22/16 09:36
Re: Amtrak 42 headed east late with NS power
Author: Out_Of_Service

RRTom Wrote:
-------------------------------------------------------
> Train was EB past Exton PA with two Amtrak engines
> in front around 6PM+/-. That's more than 2 hours
> late.
>
> (corrected to say EB)

Sprinter and P unit or 2 P units ???



Date: 06/22/16 09:43
Re: Amtrak 42 headed east late with NS power
Author: RRTom

2 P units



[ Share Thread on Facebook ] [ Search ] [ Start a New Thread ] [ Back to Thread List ] [ <Newer ] [ Older> ] 
Page created in 0.0732 seconds