Home | Open Account | Help | 337 users online |
Member Login
Discussion
Media SharingHostingLibrarySite Info |
Eastern Railroad Discussion > NS H75 Bethlehem to Bath, PA with Slug Unit in ConsistDate: 02/12/18 11:27 NS H75 Bethlehem to Bath, PA with Slug Unit in Consist Author: birdman The NS H75 local had 3 units including an RP-M4C slug (No. 627) in the consist today.
1. Approaching the location of the old JU tower in Bethlehem 2. entering former L+NE trackage at Bethlehem 3. Passing the Moravian College Physical Training Center in Bethlehem. Date: 02/12/18 11:30 Re: NS H75 Bethlehem to Bath, PA with Slug Unit in Consist Author: birdman 4 and 5. Shifting cars at the Keystone Cement Company in Bath, PA
6. Against the train ready to leave for Nazareth and Stockertown Date: 02/12/18 11:32 Re: NS H75 Bethlehem to Bath, PA with Slug Unit in Consist Author: birdman 7. Leaving Keystone Cement in Bath, PA
8. RP-M4C slug No. 627 - middle unit of three on today's train Edited 1 time(s). Last edit at 02/12/18 12:15 by birdman. Date: 02/12/18 11:32 Re: NS H75 Bethlehem to Bath, PA with Slug Unit in Consist Author: Lackawanna484 Thanks for the pictures.
It's amazing that NS now operates more L&NE track than Lehigh & Hudson River track. Even though LNE has been gone for almost 80 years. Date: 02/12/18 12:15 Re: NS H75 Bethlehem to Bath, PA with Slug Unit in Consist Author: rbenko Lackawanna484 Wrote:
------------------------------------------------------- > It's amazing that NS now operates more L&NE track > than Lehigh & Hudson River track. Even though LNE > has been gone for almost 80 years. I concur - however, LNE has been gone for less than 60 years (abandoned October 1961). BTW, cool shots! Every summer I drink lots of craft beer in the field seen in shot #2 - the Lehigh Valley Beer Festival, or something similarly named. Edited 1 time(s). Last edit at 02/12/18 12:16 by rbenko. |