Home | Open Account | Help | 375 users online |
Member Login
Discussion
Media SharingHostingLibrarySite Info |
Eastern Railroad Discussion > DP for Sandpatch.......1.94%.Date: 11/03/19 07:31 DP for Sandpatch.......1.94%. Author: mp208 11/2/19 A westbound CSXT stacker (015) grinds out the last two miles of the eastern slope of Sandpatch at Mance, PA. It's 24 degrees and the onset of winter is but a few weeks away. The single unit DP "helper" in the middle will be a benefit for air supply as the temperatures drop. The 1-1 locomotive setup is calculated to handle the 1.94 grade from Mance to the summit.
Edited 3 time(s). Last edit at 11/03/19 19:10 by mp208. You must be a registered subscriber to watch videos. Join Today! Date: 11/03/19 14:01 Re: DP for Sandpatch.......1.94%. Author: ns1000 Possibly Q015....
Date: 11/03/19 19:03 Re: DP for Sandpatch.......1.94%. Author: mp208 You're right, thanks for the identification ns1000.
Posted from Android Edited 1 time(s). Last edit at 11/03/19 19:11 by mp208. Date: 11/04/19 03:32 Re: DP for Sandpatch.......1.94%. Author: jmbreitigan Nice video.
|