Home Open Account Help 375 users online

Eastern Railroad Discussion > DP for Sandpatch.......1.94%.


Date: 11/03/19 07:31
DP for Sandpatch.......1.94%.
Author: mp208

11/2/19  A westbound CSXT stacker (015) grinds out the last two miles of the eastern slope of Sandpatch at Mance, PA.  It's 24 degrees and the onset of winter is but a few weeks away.  The single unit DP "helper" in the middle will be a benefit for air supply as the temperatures drop.  The 1-1 locomotive setup is calculated to handle the 1.94 grade from Mance to the summit.



Edited 3 time(s). Last edit at 11/03/19 19:10 by mp208.

You must be a registered subscriber to watch videos. Join Today!




Date: 11/03/19 14:01
Re: DP for Sandpatch.......1.94%.
Author: ns1000

Possibly Q015....



Date: 11/03/19 19:03
Re: DP for Sandpatch.......1.94%.
Author: mp208

You're right, thanks for the identification ns1000.

Posted from Android



Edited 1 time(s). Last edit at 11/03/19 19:11 by mp208.



Date: 11/04/19 03:32
Re: DP for Sandpatch.......1.94%.
Author: jmbreitigan

Nice video.



[ Share Thread on Facebook ] [ Search ] [ Start a New Thread ] [ Back to Thread List ] [ <Newer ] [ Older> ] 
Page created in 0.0329 seconds