Home Open Account Help 334 users online

Model Railroading > Track Inspector on the job


Date: 02/10/19 17:43
Track Inspector on the job
Author: railstiesballast

The Federal Railroad Administration requires frequent track inspection, beginning with visual inspections like being done on my Southwestern Pacific.  Donnie Scott is really proud of his new Ford F-150 rig, shown here passing Klien Mine and easing out onto the Big Hernandez viaduct.
The third photo show the parts before final assembly.  It is a very simple circuit, using the DCC 16 volt AC power and two 402 size pre wired SMD (surface mount diode) LEDs.
This is a River Point (?) truck sold as a Hy-Rail.  I added a cross-body tool box and 1/2 oz. of lead weight.








Date: 02/11/19 09:38
Re: Track Inspector on the job
Author: funnelfan

Nice!
 

Ted Curphey
Ontario, OR



Date: 02/11/19 18:15
Re: Track Inspector on the job
Author: ChrisCampi

Looks great. Love the headlights.



Date: 02/12/19 08:59
Re: Track Inspector on the job
Author: atsf121

Really nice, that is some excellent work.  



[ Share Thread on Facebook ] [ Search ] [ Start a New Thread ] [ Back to Thread List ] [ <Newer ] [ Older> ] 
Page created in 0.0307 seconds