Home | Open Account | Help | 334 users online |
Member Login
Discussion
Media SharingHostingLibrarySite Info |
Model Railroading > Track Inspector on the jobDate: 02/10/19 17:43 Track Inspector on the job Author: railstiesballast The Federal Railroad Administration requires frequent track inspection, beginning with visual inspections like being done on my Southwestern Pacific. Donnie Scott is really proud of his new Ford F-150 rig, shown here passing Klien Mine and easing out onto the Big Hernandez viaduct.
The third photo show the parts before final assembly. It is a very simple circuit, using the DCC 16 volt AC power and two 402 size pre wired SMD (surface mount diode) LEDs. This is a River Point (?) truck sold as a Hy-Rail. I added a cross-body tool box and 1/2 oz. of lead weight. Date: 02/11/19 09:38 Re: Track Inspector on the job Author: funnelfan Nice!
Ted Curphey Ontario, OR Date: 02/11/19 18:15 Re: Track Inspector on the job Author: ChrisCampi Looks great. Love the headlights.
Date: 02/12/19 08:59 Re: Track Inspector on the job Author: atsf121 Really nice, that is some excellent work.
|