Home Open Account Help 308 users online

Passenger Trains > New Control Point CP Pacific on Pacific Surfliner route


Date: 07/15/17 13:22
New Control Point CP Pacific on Pacific Surfliner route
Author: Mudrock

CP Pacific in at the south end of the Oceanside station leading to the Track 3 platform that many train use during the day as the platform out in front of the Oceanside station is closed for construction.

Chris




Date: 07/15/17 15:02
Re: New Control Point CP Pacific on Pacific Surfliner route
Author: OTG

Hopefully this is viewable... The current/new track layout at Oceanside (rendered in perfect scale) for those wondering where this all fits in. With the new platform in NCTD is tearing out the original platforms and rebuilding them one at a time. I wonder if they'll be doing that everywhere.



Edited 1 time(s). Last edit at 07/15/17 15:03 by OTG.




Date: 07/15/17 17:01
Re: New Control Point CP Pacific on Pacific Surfliner route
Author: jofegan

How long has platform 3 been in use?

It looks like having it around will make the dance routine that occurs when Metrolink, Coaster, and Amtrak are at Oceanside less complex.

-j



Date: 07/15/17 17:27
Re: New Control Point CP Pacific on Pacific Surfliner route
Author: Mudrock

It been three weeks that Track 3 has been in service!


Chris



Edited 1 time(s). Last edit at 07/15/17 19:22 by Mudrock.



Date: 07/15/17 22:16
Re: New Control Point CP Pacific on Pacific Surfliner route
Author: Railrev

So platform/track 3 will be exclusively Coaster service?



Date: 07/16/17 06:12
Re: New Control Point CP Pacific on Pacific Surfliner route
Author: Mudrock

Metrolink will use it sometimes but now Amtrak is using it for most of its trains until the new platform in front of the station is complete.

Chris



Date: 07/16/17 17:42
Re: New Control Point CP Pacific on Pacific Surfliner route
Author: ProAmtrak

Once that's all said and done no major delays should happen with trains meeting over there with an extra track to store either a Coaster or Metrolink! I rode 785 a few years ago to connect with No. 4 in Fullerton and everything was fine until Oceanside, a Coaster was on one track, Amtrak 591 which was already running late was on the other track which resulted in 785 losing a good amount of time from a great run from San Diego until there!



Date: 07/16/17 23:56
Re: New Control Point CP Pacific on Pacific Surfliner route
Author: jst3751

OTG Wrote:
-------------------------------------------------------
> (rendered in perfect
> scale)

Accept that I belive the distance between CP Ocean and CP Escondido Junction is a lot longer than what the drawing depicts.



Edited 1 time(s). Last edit at 07/16/17 23:57 by jst3751.



Date: 07/17/17 07:06
Re: New Control Point CP Pacific on Pacific Surfliner route
Author: jointauthority

That's pretty neat that they are still using the old Santa Fe style station signs.

Posted from Android



[ Share Thread on Facebook ] [ Search ] [ Start a New Thread ] [ Back to Thread List ] [ <Newer ] [ Older> ] 
Page created in 0.0429 seconds