Home | Open Account | Help | 337 users online |
Member Login
Discussion
Media SharingHostingLibrarySite Info |
Passenger Trains > Pacific Surfliner Schedule Revision?Date: 10/09/21 09:09 Pacific Surfliner Schedule Revision? Author: Zephyr Received notification from Metrolink regarding multiple changes to schedule on Ventura Line and inclusion of Amtrak Pacific Surfliner now making local stops at Northridge and Downtown Burbank, in addition to all other stations served by Metrolink. Information depicts Pacific Surfliner operating on a different schedule for two of the existing and current trains. Revisions are effective October 25. Don't see anything in Amtrak schedules or notifications around this revision. Anybody have additional information? Looks like current 761 Pacific Surfliner will operate earlier and turn at Goleta much earlier in the day to provide an inbound LA trip early afternoon in lieu of equipment currently resting at Goleta for most of the afternoon.
Pete Oxnard, California Date: 10/09/21 10:00 Re: Pacific Surfliner Schedule Revision? Author: mundo On Schedule changes in California:
Oct 18 will see one add train to the San Joaquin Route. No changes on Capitol Route Oct 25 will see schedule adjustment on Surfliners. 10 daily trains a day San Diego - Los Angeles. No more separate weekend vs daily schedules New schedules will leave San Diego 401 am, 601 am, 701 am,1001 am,1201 pm, 201 pm, 301 pm,401 pm, 701 pm 901 pm. Note new early departure from San Diego, which as been 6 am. Leave Los Angeles, 610am,710 am,1010 am,1110am, 1210 pm, 310 pm, 510 pm,610pm, 710pm, 1020pm Two trains to San Luis Obispo, two more to Goleta. Now Metrolink has made adjustments to all routes except the San Bernardino line. This being necessary to the Amtrak time changes. Some made to improve connections between routes. NO additional trains added this time around. I have no details on Coaster changes on Oct 25. Edited 1 time(s). Last edit at 10/09/21 10:07 by mundo. Date: 10/09/21 10:59 Re: Pacific Surfliner Schedule Revision? Author: Zephyr Thanks for the info mundo! Where can one find the details of the new Surfliner schedules?
Date: 10/09/21 11:03 Re: Pacific Surfliner Schedule Revision? Author: mundo Coaster will resume a Winter Schedule Oct 25.
Find no changes to ACE commuter. Date: 10/09/21 11:16 Re: Pacific Surfliner Schedule Revision? Author: mundo Zephyr, so far do not find it posted yet.
Date: 10/09/21 13:00 Re: Pacific Surfliner Schedule Revision? Author: SLORailfanning Second train to SLO... 763 returns to SLO instead of ending at Goleta?
Date: 10/09/21 14:21 Re: Pacific Surfliner Schedule Revision? Author: mundo Thats what I posted. Two to SLO 2, to Goleta.
Date: 10/09/21 18:03 Re: Pacific Surfliner Schedule Revision? Author: OTG SLORailfanning Wrote:
------------------------------------------------------- > Second train to SLO... 763 returns to SLO instead > of ending at Goleta? Nope. 761 returns as a 4am train from Daygo to SLO. 763 still terminates at Goleta and turns for 784. Basically they rolled the schedule back about 10 years. Date: 10/09/21 18:32 Re: Pacific Surfliner Schedule Revision? Author: mundo Lets try again eff Oct 25, numbers and times change.
761 and 777 TO SLO 765 and 785 to Goleta 774 794 SLO south 770 784 Goleta south Date: 10/10/21 08:55 Re: Pacific Surfliner Schedule Revision? Author: webmaster What is the reason for the :01 departure times rather than on the hour?
Todd Clark Canyon Country, CA Trainorders.com Date: 10/10/21 13:15 Re: Pacific Surfliner Schedule Revision? Author: MyfordBrowning webmaster Wrote:
------------------------------------------------------- > What is the reason for the :01 departure times > rather than on the hour? > Railroads have a long history of avoiding using 'even' hours (:00). There were rules that train orders must not use even hours in the starting times. Cliff |