Home | Open Account | Help | 347 users online |
Member Login
Discussion
Media SharingHostingLibrarySite Info |
International Railroad Discussion > Switching the BB40's (Brazil)Date: 03/08/24 17:39 Switching the BB40's (Brazil) Author: pedrop I was at Prudente de Morais town on Wednesday and could watching nice trains. Here it is a couple of the heavy yard switcher they have there. These units arrived with a pig iron train from the loading area and left it near the station to a trio of BB40-9W's get it to take its way to Vale mining port in Vitoria, ES.
1) The couple of BB40's coming from the grade where it left the freight cars with pig iron; 2 - 3) Passing by the U20C yard switchers. Pedro Rezende Vespasiano MG, Edited 1 time(s). Last edit at 03/08/24 17:47 by pedrop. Date: 03/08/24 17:42 Re: Switching the BB40's (Brazil) Author: pedrop 4 - 5) Passing by the BB40-9W's that will get the pig iron train;
6) The Dash 9's start moving to get the pig iron train. Pedro Rezende Vespasiano MG, https://youtube.com/c/minasgeraisrailways1 Date: 03/08/24 17:46 Re: Switching the BB40's (Brazil) Author: pedrop 7) Crossing the road;
8) The video. That's all for today. Pedro Pedro Rezende Vespasiano MG, https://youtube.com/c/minasgeraisrailways1 You must be a registered subscriber to watch videos. Join Today! Date: 03/08/24 22:04 Re: Switching the BB40's (Brazil) Author: BoilingMan Photo 7- Why are the gates up?!
SR Date: 03/09/24 01:53 Re: Switching the BB40's (Brazil) Author: pedrop They are not working.
BoilingMan Wrote: ------------------------------------------------------- > Photo 7- Why are the gates up?! > SR Pedro Rezende Vespasiano MG, https://youtube.com/c/minasgeraisrailways1 Date: 03/09/24 12:42 Re: Switching the BB40's (Brazil) Author: Ritzville Very NICE to see all the different power and interesitng video!
Larry |