What it takes to get 18,000 tons going - on a 2.2%grade
Author: jigbobby

The mid-train helpers hit it hard to get a coal train going at the Austin curve on Mullan Pass. Funny to see the engineer looking out the window to see if he's moving yet.

You must be a registered subscriber to watch videos. Join Today!




Date: 10/15/14 15:34
Re: What it takes to get 18,000 tons going - on a 2.2%g
Author: blackhillshogger

That's how ya do it!



Date: 10/15/14 15:36
Re: What it takes to get 18,000 tons going - on a 2.2%g
Author: 2ebright

Outstanding!!

Dick
Roosevelt, UT



Date: 10/15/14 15:41
Re: What it takes to get 18,000 tons going - on a 2.2%g
Author: syscom3

Nice catch.



Date: 10/15/14 15:44
Re: What it takes to get 18,000 tons going - on a 2.2%g
Author: ButteStBrakeman

jigbobby Wrote:
-------------------------------------------------------
> Funny to see the engineer looking out the window
> to see if he's moving yet.


Any good hoghead will look out that window when starting that much tonnage. Great video!


V

SLOCONDR



Date: 10/15/14 15:58
Re: What it takes to get 18,000 tons going - on a 2.2%g
Author: callum_out

With that much train it doesn't start all moving at once anyway, he's looking
at his part!

Out



Date: 10/15/14 16:13
Re: What it takes to get 18,000 tons going - on a 2.2%g
Author: BNSF-6432

Can't beat the sound! Awesome video. Thanks

PQM



Date: 10/15/14 16:23
Re: What it takes to get 18,000 tons going - on a 2.2%g
Author: mojaveflyer

Mountain railroading at it's best! Can't beat a set of EMDs working hard... Nice clip!

James Nelson
Thornton, CO
www.flickr.com/mojaveflyer



Date: 10/15/14 16:24
Re: What it takes to get 18,000 tons going - on a 2.2%g
Author: SCL985

Enjoyed the video, great sound.



Date: 10/15/14 16:46
Re: What it takes to get 18,000 tons going - on a 2.2%g
Author: BruceStikkers

Thoroughly enjoyable, thanks a lot for getting it recorded and posted.

Bruce



Date: 10/15/14 17:01
Re: What it takes to get 18,000 tons going - on a 2.2%g
Author: CNW

I enjoyed the sound! And great video!

Dennis



Date: 10/15/14 17:33
Re: What it takes to get 18,000 tons going - on a 2.2%g
Author: wa4umr

WOW! It sure isn't going to set a drag strip record on the quarter mile but a dragster isn't going to budge that thing. That's one impressive display of power. That's also some nice work in recording it, both picture and sound.

John



Date: 10/15/14 17:51
Re: What it takes to get 18,000 tons going - on a 2.2%g
Author: Milw_E70

Thanks for posting this! Ugh, it makes miss that place even more!!!



Date: 10/15/14 17:56
Re: What it takes to get 18,000 tons going - on a 2.2%g
Author: steve_misky

TOTALLY AWESOME. THANK YOU! for posting
Just wondering.. Are those AC traction units, if so, would DC traction have been able to handle that?



Edited 1 time(s). Last edit at 10/15/14 18:01 by steve_misky.



Date: 10/15/14 18:13
Re: What it takes to get 18,000 tons going - on a 2.2%g
Author: SlipperyWhenWet

he isnt looking out the window to see if he is moving, he obviously knows he hasnt yet. He is looking to make sure he doesnt have wheel slip, you can really f*ck up an engine if you have wheel slip and keep it notched up.

Yes those would be AC traction engines and no DC would not be better, AC traction is 100x better than DC traction. It takes 3 DC engines to do the same work that 2 AC engines do. AC engines you cant burn out the traction motors, DC go out pretty easily when you are working with real heavy trains. Those AC traction motors are best used for low and slow speed with extreme heavy tonnage



Date: 10/15/14 18:33
Re: What it takes to get 18,000 tons going - on a 2.2%g
Author: steve_misky

thanks. I was also thinking the engineer was making sure he wasn't moving backwards..

I assume, he's trying to hold the train under power while the head-end releases the brakes and then stretches the head end of the train,
since the helpers seemed to "suddenly start moving" when they started to move.?



Edited 1 time(s). Last edit at 10/15/14 18:43 by steve_misky.



Date: 10/15/14 18:41
Re: What it takes to get 18,000 tons going - on a 2.2%g
Author: espeefan

BNSF-6432 Wrote:
-------------------------------------------------------
> Can't beat the sound! Awesome video. Thanks
>
> PQM


I totally agree!
I've pushed a few up small inclines but never mid train helpers.



Date: 10/15/14 19:19
Re: What it takes to get 18,000 tons going - on a 2.2%g
Author: stash

Awesome!



Date: 10/15/14 19:39
Re: What it takes to get 18,000 tons going - on a 2.2%g
Author: Frontrunner

EMD......enough said!



Date: 10/15/14 19:47
Re: What it takes to get 18,000 tons going - on a 2.2%g
Author: fbe

One way to do this is to listen for the engineer to say, "Helpers, here we go." The helper engineer moves the reverser to foreward, backs the independendent brakes back to say 40 psi and moves the throttle to 3 or so to get about 1,000 amps on the traction motors. As the brake pipe pressure starts to come up, add more throttle and drop the independent brakes. As the helpers start to move it is full mu sand and as much power as you can add without slipping. You get to run 8 pretty quickly and just stay there unless the engineer asks you to back off.

Others may do things differently but this is a common method.