Home Open Account Help 290 users online

Western Railroad Discussion > Connection Track for SCAM in Perris CA Any new information?


Date: 06/02/23 10:46
Connection Track for SCAM in Perris CA Any new information?
Author: Trainman41

I just wondered if anyone has heard about any new developments on the project to connect the Metrolink track in Perris with the museum track of the Southern California Railway Museum.
This is a project that has been stalled for many years.  The switch off of the Metrolink line has been installed for years.  All that's needed is the switch connecting it to museum trackage.  Several
pieces of donated railroad equipment have been waiting all this time, to reach the museum,  but the track connection has to be finished first.



Date: 06/02/23 12:53
Re: Connection Track for SCAM in Perris CA Any new information?
Author: callum_out

Switch might be done but wasn't there some discussion on switch interlock and signalling?   Would be nice to hear
some "official" news on this though. I'd be curious as to what might be next, is this going to be a crossover off the
track into the depot? 

Out 



Edited 1 time(s). Last edit at 06/02/23 12:54 by callum_out.



Date: 06/02/23 13:07
Re: Connection Track for SCAM in Perris CA Any new information?
Author: longliveSP




Date: 06/02/23 14:07
Re: Connection Track for SCAM in Perris CA Any new information?
Author: callum_out

Thanks for the memory jog.

Out 



[ Share Thread on Facebook ] [ Search ] [ Start a New Thread ] [ Back to Thread List ] [ <Newer ] [ Older> ] 
Page created in 0.0339 seconds